
High Performance HMI-Projector BP 12 Platin-II PANI
Projection and Lighting Vertriebs GmbH
5
2.3) Ballast
Control Panel on the Ballast
1
Source Power Signal Lamp
Lights up, when the ballast is connected on primary circuit.
2
ON- button (green)
Short pressing the ON-button causes operating the main contactor, closing the
ignition circuit and igniting the HMI-lamp by high voltage.
3
OFF- button (red)
The lamp source will be roken. For re-ignition we recommend to enable the
equipment to cool down some minutes. (Hot restrike is possible, but shortens
the lamp lifetime).
4
Remoteswithch/ Ground Check Button
Position left (switch function): Remoteposition: ignition of the projector
occurs automatically by powering up the equipment.
Position right (bottom function): with correct polarity and intact earth the
beside-lying, yellow indicator light (5) is lit up.
5
Grounding indicator light
6
Main safety device
1 automatic circuit braker, 2 pole
7
Overload protection
8
Control cable
connection ballast – projector control panel Pos. 5
9
Supplying cable
connection ballast – projector control panel Pos. 6
10
Direct line cable
3x 6 mm², 2m long, free ends.
€•‚ƒ
IMPORTANT REMARK
208/220/240V-50/60Hz
BU12K
IP32
WICHTIGER H I N W E I S
Protective system
Schutzart
Max. environment temp.
Max. Umgebungstemp.
Rated volt.:
Nennspg.:
Type
19214
Order Code
Weight
Gewicht
Rated cap.
Nennleistung
Serial No.
Serien Nr.:
40°C
115kg
Best. Nr.