INTELLIGENT NMC USER MANUAL
37
Reboot Orderly: Send shutdown commands to all smart loads on the outlet
group, wait the programmed delay, then remove power from the outlet group.
Wait “Reboot Duration” then restore power to the outlet group.
Reboot Delayed:
Wait “Off Delay” then remove power from the outlet group. Wait
“Reboot Duration” then restore power to the outlet group.
Reboot Immediately: Immediately remove power from the outlet group. Wait
“Reboot Duration” then restore power to the outlet group.
On: Immediately restore power to the outlet group.
On Delayed:
Wait “On Delay” then restore power to the outlet group.
Setting the Outlet Power On/Off Delay for Panduit NMCs
This is only applicable to outlet group switched UPS.
1. Select the
Home Icon
then
Control & Manage
from the drop-down menu in the
Web GUI.
2. Select the outlet(s) for which to set a delay by clicking on the pencil icon.
3. Configure the length of the delay and/or length of reboot.
4. Select
Save.
Outlet Power Sequence Setup
The outlet groups can be programmed to have a pre-determined on delay or off delay.
(e.g. On Delay can be used to implement power on sequencing to avoid surge spikes or
circuit breaker overload associated with IT equipment all being turned on at the same
time.)
1. Select the Home Icon then Control & Manage from the drop-down menu in the
Web GUI
2. For each Outlet Group select the
Edit
pencil.
Figure 42: Edit Outlets
Содержание Smartzone UPS INTELLIGENT NMC
Страница 1: ...User Manual UPS Network Management Card Version 1 1...
Страница 4: ...INTELLIGENT NMC USER MANUAL 4...
Страница 10: ...INTELLIGENT NMC USER MANUAL 10 Figure 3 Network information from CLI...
Страница 56: ...INTELLIGENT NMC USER MANUAL 56 Figure 58 Enable Role Privileges 4 LDAP authentication is ready to use...
Страница 97: ...INTELLIGENT NMC USER MANUAL 112...