INSTRUCTIONS CM336
For Technical Support: www.panduit.com/resources/install_maintain.asp
1.6a
1.6b
Knockout
Knockout
Option 1
Option 2
1.2
26"
(To Junction Box)
6'
Floor
2 X 4 Stud
Center hole
for security screw
Top
Mounting eyelets
16"
32"
Bottom
Mounting eyelets
Step 1: Mounting Enclosure to Wall / Electrical Box Installation
1.1 Locate the wall studs (16" on center in most U.S.
cases).
1.2 Center enclosure over 3 studs drill holes for 5/16”
lag bolts for top mounting eyelets first. (2 places)
Note: Lag bolts not supplied
1.3 Install top lag bolts leaving a gap the thickness of
the enclosure sheet metal.
1.4 Hang enclosure on top lag bolts and tighten.
1.5 Install lower lag bolts. (2 places)
1.6 Install lag bolt at center hole to prevent vertical
movement.
If Mounting Electrical Box inside Enclosure:
Determine which side of enclosure the electrical
box will be mounted. There are two options for
routing the conduit when mounting the electrical
box inside the enclosure.
Option 1 - Inside of Enclosure: Mount electrical
box on desired side of enclosure using PEM
studs (nuts not included). Remove knockout from
top of enclosure on corresponding side of
mounted electrical box. Run conduit through
knockout hole along inside edge of enclosure to
the electrical box. (See figure 1.6a)
Option 2 - Outside of Enclosure: Remove knock-
out from side of enclosure the electrical box will
be mounted. Mount the electrical box. Run con-
duit along the outside of enclosure and connect
to electrical box through the knockout hole (See
figure 1.6b).
Page 2 of 6