68 av 82
OPERATION AND MAINTENANCE MANUAL I ENG_OMM_CD200IQ_P03 I 2023-03-16
@Pandrol 2023
(2)
(1)
11. Maintenance
11.1. General
MAINTEANCE AND OVERHAUL SHALL ONLY BE CARRIED OUT BY QUALIFIED PERSONNEL
CD200IQ is designed to require a minimum of maintenance. All components are selected funcion for
a long time of period and to maintain high quality.
Required maintenance:
• Daily inpection and mainentance before and after working shift.
• Grease lubrication every 40 working hours or once per week.
• General maintenance every 500 working hours or once per year.
Warranties and claims are only valid and accepted if Pandrol original spare parts are used and the
work is carried out by a qualified service provider approved by Pandrol. All warranty related work
must be approved and documented by Pandrol AB before warranty repair work is carried out.
Ì
WARNING!
All adjustments, overhaul and maintenance must be carried out with the engine shut
down, cooled down, tools disconnected and depressurized. Ignoring this can lead to
severe injury of a person or damage to the equipment. All service and maintenance
work must be carried out by a qualified person approved by Pandrol AB.
11.2. The tools are stuck to the rail
Possible causes:
• Electrical fault
• Out of fuel
• Faulty engine
Solution:
The tools can be forced to be opened if a emergency
occurs by
removing cover and pushing button on valve.
(1) Clipping/Declipping tool
(2) Sleeper lift
Fig 101.
Содержание CD200 IQ
Страница 1: ...Partners in excellence ENG_OMM_CD200IQ_P03 2023 03 16 CD200 IQ OPERATION AND MAINTENANCE MANUAL...
Страница 2: ...2 av 82 OPERATION AND MAINTENANCE MANUAL I ENG_OMM_CD200IQ_P03 I 2023 03 16 Pandrol 2023...
Страница 53: ...53 av 82 OPERATION AND MAINTENANCE MANUAL I ENG_OMM_CD200IQ_P03 I 2023 03 16 Pandrol 2023...
Страница 80: ...80 av 82 OPERATION AND MAINTENANCE MANUAL I ENG_OMM_CD200IQ_P03 I 2023 03 16 Pandrol 2023...
Страница 81: ...81 av 82 OPERATION AND MAINTENANCE MANUAL I ENG_OMM_CD200IQ_P03 I 2023 03 16 Pandrol 2023...