7
INSTALLATION PLACE AND POWER SOURCE FACILITY
Avoid the direct sunshine and rain, and install in an indoor
place with less humidity and dust.
(Indoor ambient temperature -10 to 40
℃
)
Do not install in a place where a metallic foreign
substance may enter inside the welding source.
Install the welding source 20cm or more away from the wall:
when installing two or more units, they should be separated
30 cm or more from each other.
Install in a place where welding arc is not exposed to the
wind. (Set up a screen. etc. to prevent the wind.)
Range of temperature of the ambient air:
(
a
)
during welding:-10 to 40 deg-C,
(
b
)
after transport and storage:-20 to 55 deg-C
Humid:
(
a
)
up to 50% at 40deg-C,
(
b
)
up to 90% at 20deg-C
Altitude above sea level: up to 1000 m.
Power Source Facility
Power source
YD-500KR2
YD-500KR2HD0
YD-500KR2HU0
3-Phase 220V
3-Phase 380V
Frequency
50/60 Hz (Switch able on the printed circuit board)
Facility
capacity
Commercial power
source
40 kVA
Engine generator
Twice large than 31.9 kVA with compensating winding.
Primary line current
Approx. 83.7 A
Approx. 48.3 A
Cable
sectional
area
Welding
source
input side
22 mm
2
or more
14 mm
2
or more
Welding
source
output side
38 mm
2
or more
When using at a construction site or in a humid place or on an iron plate or steel frame, a
leakage breaker should be also installer.
…………………………………………………………………………………………………………………
Содержание YD-500KR
Страница 45: ...CIRCUITDIAGRAM ...
Страница 46: ...44 OUTSIDE DRAWING W D H YD 500KR2 436 675 762 ...