Configuration
12
4.3 connections& operations of the cooling system
●
Precautions when adding coolant
When adding or replenishing coolant, please proceed from the front [coolant supply port
Contact with live parts will cause fatal electric shock. To avoid casualty
accident, please observe the following precautions
When adding coolant, the power switch and the switch of power distribution box must be turned off
In the process of coolant replacement,
please insert the exhaust connector at
the coolant outlet. After the coolant is
filled, please pull out the exhaust
connector in time. The exhaust
connection is suspended near the
coolant outlet.
NOTE:
it may cause faults once there is coolant splashing on the power supply or this product. Wipe the liquid drop
immediately
To avoid injury, please observe the following rules
When the temperature of the coolant increases during operation, the
exchange of coolant should be conducted after the temperature drops
1.
Replace the coolant after the temperature drops.
2.
Do not touch the hose plug during operation
3.
Check and maintain after confirming the temperature drop.
●Connection
(1)
Connection for coolant outlet
Connect the water outlet cable on the wire feeder to the coolant outlet.
(2)
Coolant inlet connection
Connect the return water cable on the wire feeder to the coolant outlet
.
●Operation confirmation
(
1)
Confirmation before operation
In order to avoid idling, it is necessary to confirm whether the connections are reliable and whether the
liquid level of the coolant tank is above the minimum level line.
NOTE:
Air transfer will cause pump failure.
(2)
Confirmation in operation
After turning on the power switch, make sure that there is cooling air blowing out from the side panel of the
liquid cooling system. Otherwise, the power supply should be disconnected immediately to find out the cause.
(3)
Operation sequence
・
Turn on the power supply of the welding machine, the water pump and fan start to run, and the coolant
circulates in the welding gun.
NOTE:
For the first time, it takes about 10 seconds from the start of pump operation to the completion of the
first water circulation.
(
It varies according to the length of the waterway
)。
・
Due to the long pipeline, it takes up more coolant. If the coolant level is below the lower limit (min), stop
the operation for coolant replenishment, and add the coolant to the position above the min.
・
At the end of the operation, the power should be turned off after the welding gun has cooled down
sufficiently.
・
When the welding machine is standby for more than 7 minutes, the coolant circulation device will
automatically stop running and enter the power saving mode. When the welding gun switch is pressed
again, the cooling liquid circulating device will run again.
exhaust
connector
Содержание YD-350FD2
Страница 9: ...Rated Specifications 6 2 4 Dimensions 机型 W H L YD 350FD2HGY 570 1060 1200 YD 500FD2HGY ...
Страница 30: ...Operation 27 9 2 CRATER Operation Turn the torch switch on and off twice ...
Страница 42: ...Parts list 39 Right view Left view 1 3 11 12 13 15 16 43 48 51 52 53 56 35 2 4 5 6 7 8 9 10 14 26 54 55 40 ...
Страница 45: ...Circuit diagram 42 13Circuit diagram 13 1 Circuit diagram for YD 350FD2HGY ...
Страница 46: ...Circuit diagram 43 13 2 Circuit diagram for YD 500FD2HGY ...