Installing the Duplex Unit/Kit
Setting Up the DP-C106
1-31
9.
Remove the Left Connector Cover (Plain) located on the lower left-hand
side of the Printer. DO NOT discard this cover.
CAUTION
Ensure that the small connector and cable on the left-hand side of the Lower
Inverter are pulled back out of the way.
10. Install the Lower Inverter as shown below.
The Lower Inverter does not install flush with the Printer covers.
a.
Install the two Thumb Screws from the contents of the box.
SMALL
CONNECTOR
AND CABLE
Содержание WORKIO DP-C106
Страница 29: ...Setting Up the DP C106 Installing the System Console 1 8 This page is intentionally left blank ...
Страница 39: ...Setting Up the DP C106 Unpacking the Printer 1 18 This page is intentionally left blank ...
Страница 59: ...Setting Up the DP C106 Loading Paper in the Paper Tray 1 38 This page is intentionally left blank ...
Страница 71: ...Setting Up the DP C106 Installing the Scanner with ADF 1 50 This page is intentionally left blank ...
Страница 84: ...Installing the 10 Bin Sorter Setting Up the DP C106 1 63 11 Slide the 10 Bin Sorter to the right into position ...