163
■
Checklist
It is recommended that the worksheets be completed in the following sequence:
Date completed: ___/ ___/ ___
●
Master-Slave
●
Logical Camera Number
Camera
LCN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Master
ON
Slave 1
ON/OFF
Slave 2
ON/OFF
Slave 3
ON/OFF
Slave 4
ON/OFF
Master and Slave 1
Camera
Slave 1
LCN
Master
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Normal connection (one unit only)
Master, Slave 1 and Slave 2
Camera
Slave 1
LCN
Slave 2
Master
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Содержание WJ-SX 150A
Страница 8: ...9 FEATURES OF THE MATRIX SWITCHER SYSTEM ...
Страница 22: ...23 DETAILED PRODUCT DESCRIPTION ...
Страница 29: ...31 INSTALLATIONS AND SYSTEM CONNECTIONS ...
Страница 54: ...57 WJ SX150A SETUP PROCEDURES ...
Страница 100: ...103 OPERATING PROCEDURES TERMINAL MODE ...
Страница 119: ...123 OPERATING PROCEDURES PS DATA ...
Страница 125: ...129 EXPANDED FUNCTION ...
Страница 147: ...151 APPENDIX ...