9-25
■
Assembly of LAN, Modem and MDC
Safety Working
MDC
Tighten of
Screw
Tighten of
Screw
Tighten of
Screw
Tighten of
Screw
LAN Cable
is installed.
Modem Cable
is installed.
Modem LAN Case
is installed.
Cable
Coil
Attach the DMD Cable Sheet
Order of fixing
Screw
Screw
* Notes:
1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2
(Remove 2 places)
Match to the edge of the Connector. –1
Separate from the coil.
Attach
space
CAUTION
S1:Insulation S2:Bitten S3:Sharp Edge
S4:Part No. Check S5:Other
S2
5–1
15–1
Process the cable and cover
with MDM Cable Sheet
Pass the Cable to the back
from the hole of the A side.
S1
S1
㪪㫌㪹㫊㫋㫉㪸㫋㪼㩷㪼㫅㪻㩷㪽㪸㪺㪼㩷㪸㪻㫁㫌㫊㫋㫄㪼㫅㫋
㪪㫌㪹㫊㫋㫉㪸㫋㪼㩷㪺㫆㫅㪺㪸㫍㪼㩷㪻㪼㫇㪸㫉㫋㫄㪼㫅㫋
CAUTION
S1:Insulation S2:Bitten S3:Sharp Edge
S4:Part No. Check S5:Other
Reusing the attaching parts is impossible
<Notes>
1.Apply the load when attaching the attaching parts. 20
䱊
30
䰚䯴
2
䱊
3Kgf
䯵
/cm2
㪪㫌㪹㫊㫋㫉㪸㫋㪼㩷㪺㫆㫅㪺㪸㫍㪼㩷㪻㪼㫇㪸㫉㫋㫄㪼㫅㫋
㪧㪸㫉㫋㩷㪼㫅㪻㩷㪽㪸㪺㪼㩷㪸㪻㫁㫌㫊㫋㫄㪼㫅㫋
Paste
Paste
Bustraid
Bustraid Sheet
㪚㫆㫉㫅㪼㫉㩷㪸㪻㫁㫌㫊㫋㫄㪼㫅㫋
㪠㩷㪻㫆㫅㩾㫋㩷㫊㫋㫀㪺㫂㩷㫆㫌㫋
㪫㪿㪼㩷㫋㪿㫀㫅㪾㩷㪼㫅㫋㫆㫌㫉㪸㪾㪼㩷
㫆㫇㪼㫅㩷㫄㫆㫉㪼㩷㫋㪿㪸㫅㩷㪈㪅㪌㫄㫄
㩷㩿㪽㫆㫉㩷㫋㪿㪼㩷㪻㪼㫊㫀㪾㫅㩷㫍㪸㫃㫌㪼㪃㩷㪊㫄㫄㪀