EN3
Co
nfi
r
m
at
io
n
Ins
tal
lation
Ho
w to Use
M
aint
enanc
e and
replac
ement
W
hen n
ec
es
sa
ry
Engli
sh
Safety Precautions
EN4
Operating Precautions
EN9
Names of the Parts and Steps to Take Before Operation
EN10
Steps to take before operation
EN12
Installation 1
Check the main unit and supplied accessories
EN13
Installation 2
Checking the faucet
EN14
Installation 3
Attaching the bypass selector
EN15
Installation 4
Installing the Alkaline Ionizer
EN18
Installation 5
Checks after installation
EN20
Installation 6
Measure and adjust the pH level of water
EN22
Usage of Water
EN24
How to Use
EN26
Maintenance
EN28
Replacing the Cartridge
EN29
Automatic Electrode Cleaning
EN31
Changing the Settings
EN32
When the Power or Water Supply is Cut Off
EN33
When not in use for a long time
EN33
When Moving the Alkaline Ionizer
EN34
Q&A
EN35
Before Requesting a Repair Service
EN38
Specifi cations
EN41
Optional Accessories
EN42
Contents
TK-AS700_En.indb 3
TK-AS700_En.indb 3
2022/04/14 18:17:36
2022/04/14 18:17:36