Page 1-9
1
INST
ALLA
TION
Preparations for Installation
1F4C-E-IMA01-A01-01
C) Instructions for connecting PT Ethernet cables
SP28 is not equipped with HUB. Following the steps below, connect PT Ethernet cables.
1) Stand-alone
1
. Connect the cable indicating CROSS, to
CN1 of CPU board: SCMYEX.
2
. Connect a PT Ethernet cable to CNRI
located at the right end of the machine.
2) Left-to-right flow
1
. Connect the cable indicating CROSS, to
CN1 of CPU board: SCMYEX.
2
. Connect the connector CNLI located at
the left side of the downstream machine
with the connector CNRI located at the
right side of SP28.
3) Right-to-left flow
1
. Connect the cable indicating STRAIGHT,
to CN1 of CPU board: SCMYEX.
2
. Connect the connector CNRI located at
the right side of the downstream ma-
chine with the connector CNLI located at
the left side of SP28.
1F4C-808E
1F4C-809E
1F4C-810E
Содержание SP28P
Страница 2: ......
Страница 6: ...Page 4 1F4C E IMA00 B01 00 MEMO ...
Страница 7: ...Page 5 1 InstallationManua InstallationManual l 1F4C E IMA00 A02 03 SAFETY PRECAUTIONS INSTALLATION ...
Страница 12: ...Page 10 MEMO 1F4C E IMA00 A03 01 ...
Страница 20: ...Page 1 8 Preparations for Installation 1F4C 811E 1F4C E IMA01 A01 01 ...
Страница 28: ...Page 1 16 1F4C E IMA01 A01 00 MEMO ...