90
Step 6 :
Remove Main P.C.B..
Step 7 :
Place the Main P.C.B., Sensor P.C.B. Amplifier Unit and Sub Chassis Unit on an insulated material as shown.
Step 8 :
Attach 5P Wire at the connector (CN2002) on the Main P.C.B..
Step 9 :
Attach 6P Wire at the connector (CN2003) on the Main P.C.B..
Step 10 :
Attach 8P FFC at the connector (CN2001) on the Main P.C.B..
Step 11 :
Attach 5P FFC at the connector (CN2008) on the Main P.C.B..
Step 12 :
Attach 4P Wire at the connector (CN5101) on the Main P.C.B.
Step 13 :
Attacht 9P FFC at the connector (CN3001) on the AUX P.C.B..
Содержание SC-HTB70P
Страница 24: ...24 ...
Страница 28: ...28 11 2 Types of Screws 11 3 Main Parts Location Diagram ...
Страница 39: ...39 Step 4 Lift up to remove the Sub Chassis Unit ...
Страница 49: ...49 Step 8 Release 1 catch Step 9 Remove the AC Holder ...
Страница 55: ...55 Step 3 Remove 2 screws Step 4 Remove the Button Holder ...
Страница 60: ...60 11 14 2 Assembly of 6P Wire Main Button Step 1 Dressed the 6P Wire into the ribs of the Front Panel Block ...
Страница 88: ...88 Step 13 SMPS P C B and AC Inlet P C B can be checked as diagram shown ...
Страница 92: ...92 Step 17 Main P C B Side A can be checked as diagram shown ...
Страница 94: ...94 Step 13 Main P C B Side B can be checked as diagram shown ...
Страница 98: ...98 Step 17 AUX P C B and Sensor P C B can be checked as diagram shown ...
Страница 101: ...101 Step 6 LED P C B can be checked as diagram shown ...
Страница 102: ...102 ...
Страница 110: ...110 ...
Страница 132: ...132 WF No Q5504 3 PLAY 24Vp p 500nsec div WF No Q5504 5 PLAY 7 0Vp p 500nsec div ...
Страница 136: ...136 ...
Страница 140: ...140 ...