
ADJ - 7
1. 5. Model Information Setup
1. Setting to service mode and select sub menu "MODEL" of main menu "EXTRA OPTION".
2. Select a model and push the “ENTER” button.
3. When to turn off the main power and turned on again, the setting is complete.
1. 6. Clog sensor calibration
Notes :
・
After completing the "EEPROM data transfer", Please carry out.
・
Please replace with a new air filter before starting calibration.
・
This operation should be done with the main body is completely assembled and set on the floor and
the adjuster legs are set in the main body.
・
Please calibration at a location where there are no heat apparatus and supply opening of the air-conditioner.
1. Setting to Service mode and select sub menu "CLOG SENSOR CALIBRATION" of main menu "EXTRA OPTION".
2. Select the meters above the sea level of the work place and push the "ENTER" button.
3. When [ OK ] is selected and ENTER button is pressed, the calibration is executed.
4. When the magenta screen will disappear in approx 15 minutes and it returns to the normal screen, the calibration
is completed.
Turn the POWER switch OFF and turn ON it again, then confirm whether to operate normally.
・
When the calibration is started, the screen becomes whole magenta.
・
While calibrating, all lamps will light (DUAL mode).
・
Do not shut down the power of projector during the calibration.
・
The progress is shown at the left top portion of the display with % unit.
30 %
Содержание PT-DZ13KU
Страница 6: ...6 2 Specifications 2 1 Specifications The specifications of the projector are as follows...
Страница 8: ...8 2 3 Terminal...
Страница 9: ......
Страница 11: ...INF 2 1 The name of each part 1 1 Projector body Front Rear Si Bottom...
Страница 12: ...INF 3 1 2 Control panel 1 3 Connecting terminals...
Страница 13: ...INF 4 1 4 Remote control Front Top Si Bottom...
Страница 14: ...INF 5 2 Menu Navigation...
Страница 15: ...INF 6...
Страница 16: ...INF 7...
Страница 17: ...INF 8...
Страница 35: ...INF 26 5 Select Log SYSTEM and click Get button 6 Log is displayed...