Refrigerant Charging
Evacuation (Perform after completing electrical wiring.)
To avoid inclusion of air or moisture in the refrigerant circuit, be sure to execute vacuum drying of the entire circuit by
using a vacuum pump, before charging refrigerant. By following procedure, execute evacuation after securely carrying
out airtight test.
(1) Connect electrical wiring
(2) Enter the Vacuum Mode by following sequence
- Check the Electrical Circuit Breaker to be OFF (No electric power charged to the unit)
- Turn the No.1 and 2 of 8P Dip Switch (SW13) ON. No. 3~8 shall be OFF.
- Set the Slide Switch (SW15) to [CHECK].
then,
- Turn the Electrical Circuit Breaker ON.
- Turn the Operation Switch (S1) to ON.
- Set the Rotary Switch (SW11) to [OPERATION]
- Check that [uAcU] is indicated in the 7-segment LED.
7-segment LED shall indicate
“Low Pressure → High Pressure → Unit outlet Pressure → [uAcU] → Low Pressure → ….”.
Check Operation Switch (S1) is ON.
If yes, the unit is confirmed to enter Vacuum Mode (even though 7-segment LED is showing [uAcU], the unit is not
in the Vacuum Mode if (S1) is OFF).
In the Vacuum Mode, all electronic expansion and solenoid valves open.
(3) Evacuation
- Connect the vacuum pressure gauge and vacuum pump to the low pressure and high pressure service ports,
and open both.
- Apply evacuation from the two ports.
- Evacuate down to 133 Pa (1 Torr), target level for evacuation, and continue for 1 to 3 hours.
- Execute the refrigerant charging immediately after evacuation, according to the charging procedure described
in the next page.
Access port of low pressure
service valve
Access port of high pressure
service valve
Compressor
Electrical box
Front of refrigeration unit