1.4
Vacuum evacuation of cooling circuits
preparation
:
Explosion-proof vacuum pump, detector for HC refrigerant
procedure
:
Since the refrigerant is dissolved in the compressor oil, connect the explosion-proof
vacuum pump to the tip of the long hose led outdoors, and perform vacuum
evacuation from the refrigeration circuit for at least 10 minutes. (Place vacuum pump
outdoors)
When no gas is detected, shut all the valves and stop the pump.
Note
:
Apply a detector to the exhaust port of the vacuum pump to confirm that the refrigerant
has been released.
1.5
Vacuum evacuation before nitrogen blowing
Preparation
:
Nitrogen cylinder, pressure regulator, charge hose, branching instruments, tools,
leak check spray (liquid detergent can also be substituted)
Procedure
:
Connect the nitrogen cylinder as shown below and operate the explosion-proof
vacuum pump. Open the valves VC, VG, VR and perform vacuum evacuation
between the nitrogen cylinder and the dedicated GM.(About 1 minute)
Note
:
make sure connection is not leaky.
Placement
Outdoor
Exhaust for
outdoor
Long hose
Valve state
open
shut
VC
○
VG
○
VL
○
VH
○
VR
○
Dedicated GM
High pressure side
service pipe
Explosion-proof
vacuum pump
Charge hose
Nitrogen cylinder
Long hose
VR
VG
VL
VC
VH
Piercing tool
Low pressure side
service pipe
Refrigerant
port
Vacuum
port
High pressure port
Low pressure
port
Charge hose
-40-
Содержание MDF-DU702VH
Страница 8: ...Dimension MDF DU502VH 5 ...
Страница 9: ...MDF DU702VH 6 ...
Страница 17: ...Wiring Diagram 14 ...
Страница 18: ...main Circuit Diagram 15 ...
Страница 19: ...power 16 ...
Страница 20: ...USB 17 ...
Страница 73: ...WIRING YG Y Y GR B G W W W Y G R BL Y W R R BL R OR B BL R OR B Y W Y G Y G R BL 70 ...