14
4.6.
Removal of the Handle Sup-
porter Unit
1. Refer to the "Disassembly of the Body" page and disas-
semble the Body.
2. Refer to the "Replacement of the Fan Motor Unit" page
and remove the motor related parts.
3. Refer to the "Replacement of the Nozzle Holder Unit"
page and remove the Front Body.
4. Remove the 3 screws and remove the Handle Supporter
Unit.
4.7.
Disassembly of the Nozzle
Assy
1. Release the locks at the 3 places of the diagram.
2. Remove the Brush Cover Unit and the Agitator Assy.
3. Remove the 4 screws.
4. While raising the Tabs (in 4 places) of the Floor Nozzle
Upper Assy that is located on the bottom face of the Noz-
zle (housing the Agitator Assy), free it from the Floor Noz-
zle Lower Unit.
Содержание MC-UL710-WP47
Страница 2: ...2 1 Specifications ...
Страница 3: ...3 2 Location of Controls and Components ...
Страница 18: ...18 6 Exploded View and Replacement Parts List 6 1 EXPLODED VIEW ATTACHMENTS ...
Страница 20: ...20 6 3 EXPLODED VIEW BODY UNIT ...