49
Upon completing installation, check and mark off the following items.
I hereby certify that installation has been completed.
Signature of installer
Checklist
Checked
Appearance
■
Ensure that the appliance is not tilted.
■
Is the top plate clean?
Electrical
work
■
Is the power supply a single-phase (220-240 V ~), or
a three-phase (380-415 V 2N~)?
■
Has the earth been installed?
■
Has the earth leakage circuit breaker been installed?
Electrical
testing
1. Touch
to turn on the main power.
■
Does the main power light illuminate?
2. Touch the following keys to check function of
each IH heater:
■
Left front cooking zone
■
Left rear cooking zone
■
Right front cooking zone
■
Right rear cooking zone
■
Make sure to turn off each cooking zone and the main power switch after
performing electrical testing.
■
Hand the Operating Instructions / Installation Instructions to the customer.
Does “-” flash?
Post-installation Checklist