Page 1-6
1-1-6
Setting the Line Connection Cable and the Relay Board
A) Line connection cable
The line signal cables are required for the machine of line specifications.
Connect the line cable. (Refer to the page
1-7
.)
B) Setting the relay board
1) Single
:
CN00 1-2 short (Line air pressure)
2) Line connection
:
CN00 1-2 open (Line air pressure)
Connection board “EC55CX” J7 2-3 short (Ready signal)
3)
:
CN00 1-2 short (Line air pressure)
Connection board “EC55CX” J7 1-2 short (Ready signal)
Specifications of line signal
Such signals as the delivery of board between the front and rear processes production end, or air
pressure are connected among each machine with a cable.
CN01
Control
box
Machine 1
CN01
Control
box
Machine 2
Control
box
Machine 3
CN00
CN00
Connection with other
maker's machine
Preparations for Installation
1F4C-E-IMA01-A01-00
Содержание KXF-1F4C
Страница 2: ......
Страница 6: ...Page 4 1F4C E IMA00 B01 00 MEMO ...
Страница 7: ...Page 5 1 InstallationManua InstallationManual l 1F4C E IMA00 A02 03 SAFETY PRECAUTIONS INSTALLATION ...
Страница 12: ...Page 10 MEMO 1F4C E IMA00 A03 01 ...
Страница 20: ...Page 1 8 Preparations for Installation 1F4C 811E 1F4C E IMA01 A01 01 ...
Страница 28: ...Page 1 16 1F4C E IMA01 A01 00 MEMO ...