26
7 Service Fixture & Tools
7.1.
When Replacing the Main P.C.B.
After replacing the MAIN P.C.B., be sure to achieve adjustment.
The adjustment instruction is available at “software download” on the “Support Information from NWBG/VDBG-AVC” web-site in
“TSN system”, together with Maintenance software.
7.2.
Service Position
This Service Position is used for checking and replacing parts. Use the following Extension cables for servicing.
Table S1 Extension Cable List
No.
Parts No.
Connection
Form
1
RFKZ0448
FP6001(MAIN) - MONITOR FPC
33PIN 0.3 FFC
2
RFKZ0444
PP6001(MAIN) - PS6401(SD HOLDER)
50PIN 0.5 B to B
3
VFK1480
FP6003(MAIN) - ECM HOLL FPC(FRONT CASE UNIT)
6PIN 0.5 FFC
4
VFK1440
FP6402(SD HOLDER) - TOP OPERATION UNIT(SIDE CASE-R UNIT) 10PIN 0.5 FFC
5
RFKZ0379
PP6006(MAIN) - HDD FPC
40PIN 0.5 B to B
Содержание HDC-HS80PU
Страница 10: ...10 3 5 2 Precautions for installing HDD...
Страница 13: ...13 3 6 Formatting...
Страница 14: ...14 4 Specifications...
Страница 15: ...15...
Страница 27: ...27...
Страница 30: ...30 Fig D2 Fig D3 8 3 2 Removal of the Top Case Unit Fig D4...
Страница 31: ...31 Fig D5 8 3 3 Removal of the HDD Frame and DC Jack P C B Fig D6 Fig D7...
Страница 32: ...32 8 3 4 Removal of the Front Case Unit Fig D8 8 3 5 Removal of the Camera Lens Unit Fig D9...
Страница 33: ...33 8 3 6 Removal of the Main P C B and SD Holder P C B Fig D10 Fig D11...
Страница 34: ...34 8 3 7 Removal of the Battery P C B Fig D12 Fig D13...