hangers (with bolt) (without bolt) instalation

hanger instalation

The standard interval for mounting of the hangers is 1 m, and the maximum interval is 1.5 m. 

Be sure to mount the hanger bolts securely to a structural member.

DH2652 hangers (without bolt) come without  hanger bolts.

To mount the DH2652 hangers, Use M8 bolts.

Standard 1 m, maximum 1.5 m

hanger bolt

Factory Line 20 duct

Hanger

Installation of the duct

Loosen the cap securing screw and 
turn the cap to the left to remove it from 
the hanger. 

Spread apart the hanger and match the 
polarity indication on the duct with the 
polarity indication on the hanger.

Fit the duct into the hanger, and then turn 
the cap to the right and tighten the securing 
screw in order to secure the duct.

Ensure the strength of building structures enough 

to support the hanging weight (a maximum of 10 

kg per support). 

 Not doing so may cause the hanger to drop.

To use long hanger bolts, mount these bolts using 

sway braces.

Use two or more pieces of hanger for one duct.

 It will become a cause of fall if it does not so

To prevent the ducts from meandering, align the 

hanger centers.

 Not doing so may cause the hangers to drop.

Caution

1.

2.

3.

Turn the cap until it is fully locked.

 Not doing so may cause the duct to drop.

Caution

cap

Loosen

hanger bolt

Hanger

Polarity indication

Spread apart.

Spread apart.

Factory Line 
20 duct

Match the polarity 
indications.

Mount the hanger 
from the polarity marking side

Tighten

6

7

8

Connecting the ducts

Use a joiner to connect two ducts together.

Be sure to match the polarities of the ducts 

   

and the joiner and secure by tightening the 

   set screws.

Installing the feed-in cap

Attaching the end cap

Fit the cap onto the end of the duct and secure it by tightening the set screw.

Caution

An end cap must be attached onto the end of the duct.

 Doing so may result in an electric shock.

Securely fasten the setscrew.(Torque the setscrew to not 

less than 0.98 N・m〜1.32 N・m)

Caution

Duct 

Set screw

Set screw

Polarity indication
(ground side)

Joiner

Duct

Long

Short

Opening

Ground terminal

Duct

(Cutting direction)

Joiner

■Connecting the ducts

■Procedure for providing knock-out part

●Fit the feed-in cap into the duct and tighten 

   the set screw to secure it.

●Deburr the cut surface using a Cable Knife.

Connection release button

Electric wire

loading slot

Polarity
indication

Ground terminal

the peep hole

Wire

Holding part

of a fastning band

Set screw

Duct

cover

Duct

cover

Duct 

■Connection of power supply, remove about electric wire

●Strip the ends of the electrical wires in accordance with the 

stripping gauge shown on the inside of the cover, and then 

insert the electrical wires until they are visible in the peep hole.

●To disconnect the electrical wires, pull them out while using 

a screwdriver or your finger to press the connection release 

button.

End cap

Duct 

Set screw

During construction, Do not give a shock, 

such as dropping on a product, or hitting.

It may be damaged.

Combine the tip of a duct and connect certainly.

Connect a straightly both of the duct

Securely fasten the set screws. (Proper torque: 

0.98 N・m〜1.32 N・m)

Doing so may result in an electric shock or a fire.

When cutting the ducts, use a metal 

hacksaw(hand type)and cut with the opening in 

the duct facing downward as shown in the 

figure.

If a power saw is used, the insulation cladding or 

ground terminals could be scraped or burned.

After cutting, if the ground terminal protrudes 

slightly, correct it.

Remove any cutting chips or burrs from the cut 

surface.

Doing so may result in an electric shock or a fire.

Caution

①For cables not larger than VVF of 2 ㎟ in 

size with three cores or less, remove the 

shaded area.

②For cables not larger than VCT of 3.5 ㎟ in 

size with three cores or  less, remove the 

shaded area.

During construction, Do not give a shock, such 

as dropping on a product, or hitting.

It may be damaged

Connect the feed-in cap and the duct linearly.

Securely fasten the set screws. (Proper torque: 

0.98 N・m〜1.32 N・m)

Using the single-wire cable is 1.6 mm or 2 mm,

Be sure to use an insulated pin 

terminal(Insertion length: It is longer than 

15mm and is less than 21mm.) when use a 

stranded-conductor cable.

Use a triplex cable and tighten the coil to the 

ground terminal to connect one cable. 

(Proper torque: 1.2 N・m〜 1.5 N・m) 

Doing so will result in an electric shock, a fire.

After wire connection, Bind the cable with wire 

ties, etc. not to apply tension to the terminal.

Doing so will result in a fire.

6

Содержание Factory Line 20

Страница 1: ...your electrical worker to take necessary actions In such case be sure to pass Instruction and Installation Manuals Not doing so will result in an electric shock a fire or a drop Use the rated voltage within the load capacity that is always displayed Not doing so will result in a fire Use Fluorescent lighting plug below a permissible load Not doing so will result in a fire or a drop Caution this pr...

Страница 2: ...he smoke rises The place which is subject to the influence of heat such as the upper part of a heater Not doing so will result in an electric shock a fire or a drop Do not install the Factory Line duct passing through building structure Doing so may result in a fire Do not slide putting the plug in the duct Poor contact will cause a fire During construction Do not give a shock such as dropping on ...

Страница 3: ...ceiling side directly Are there loose the screw Retighten Are there discoloration or deformation in the plastic of the duct and Change it Are there adhesion and deposition of dust in the inside of a duct Remove the dirt Is a straight line connecting duct Attachment is improved so that it may become a straight line Is the thing which is not an exclusive plug attached to the duct Exchange plugs The ...

Страница 4: ... mm mount the flange and then mount a pipe to the flange Unit mm Mounting the ducts directly to the ceiling Support spacing for the duct 1 Turn the flange cover to the left to remove it 2 Use the wood screw or tapping screw then mount the flange to a structural member 3 Align the pipe mounting hole of the pipe suspension hanger with the position of the pan head machine screw to put the pipe in the...

Страница 5: ...via the pipe suspended hangers method for bringing in the power supply Route the cable from the ceiling into the pipe When doing this it is easier if the cable is passed through the pipe before securing the Factory Line 20 duct in the hanger Following the same procedure for Step fit the duct in the hanger and then fix it with the cap Use single conductor cables of 1 6 or 2 0 m in size Make wire co...

Страница 6: ... duct into the hanger and then turn the cap to the right and tighten the securing screw in order to secure the duct Ensure the strength of building structures enough to support the hanging weight a maximum of 10 kg per support Not doing so may cause the hanger to drop To use long hanger bolts mount these bolts using sway braces Use two or more pieces of hanger for one duct It will become a cause o...

Страница 7: ...rew During construction Do not give a shock such as dropping on a product or hitting It may be damaged Combine the tip of a duct and connect certainly Connect a straightly both of the duct Securely fasten the set screws Proper torque 0 98 N m 1 32 N m Doing so may result in an electric shock or a fire When cutting the ducts use a metal hacksaw hand type and cut with the opening in the duct facing d...

Страница 8: ...y cable of the grounded side to the Polarity indication ground side the terminal screw of which is plated Caution Set screw Polarity indication ground side Polarity indication ground side Duct Duct Grund terminal M4 Terminal screw plated To connect the duct with the center feed in joiner be sure to align the Polarity indication ground side with each other Only to make connection the cover needs no...

Страница 9: ...ng so may result in a fire Do not slide the plug with having come in the duct Doing so may result in faulty connection thus leading to a fire Caution Notes Do not attach the plug unit where the tapping screw is used the duct directiy Notes Do not attach the plug unit where the tapping screw is used the duct directiy 1 2 3 4 5 Do not slide the plug with having come in the duct Doing so may result in ...

Страница 10: ...g the lever duct outlet plug lever lock Notes Do not attach the plug unit where the tapping screw is used the duct directiy Do not slide the plug with having come in the duct Doing so may result in faulty connection thus leading to a fire Caution 13 Mounting an electrical outlet plug Mounting plug Matching the polarity indications on the duct and the plug insert the plug into the duct and rotate it...

Страница 11: ...ut Fluorescent lighting plug Power supply hole Locknut Mounting fluorescent lighting fixture to the duct fluorescent lighting plug and clamp lever handling method To mount Rotate clockwise until the lever no longer rotates To dismount Rotate counterclockwise until the lever no longer rotates To connect the cable to unthreaded terminal use bar type crimp style terminal Not doing so may result in fault...

Страница 12: ...oster might discolor and begins to burn because of the heat of the illuminator Caution Duct Opening Duct cover Use the poster clip to suspend a work instruction sheet or process chart from the Factory Line 20 Fold down about 10 mm of the top of the work instruction sheet or process chart and slide it sideways into the poster clip The work instruction sheet can be positioned in the desired directio...

Отзывы: