background image

71

Installation Manual

Warning and Fault Definition

On the Power Flows Page, the ERROR  icon will flash when an error has 

occurred. Listed below are the error codes and their solutions.

Operation and Display Panel

Error and Warning Definition   

 

 

 

 

 

 

 

20190617 

On the Power Flows Page, the 

 icon will flash when there is an error. Below are the error codes and their solutions. 

C

ODE

 

F

AULT 

E

VENT

 

A

LARM

 

ICON 

S

OLUTION

 

01 

DC bus voltage exceeds the upper 

threshold 

None 

 

1.  Turn off the inverter using the main switch. 

2.  Make sure PV voltage is below 500Vdc. 

3.  When the Grid is absent, disconnect any grid-tied inverter from to the load 

terminal. 

4.  Turn the inverter on. If the error remains, contact your installer. 

02 

Arc occurs on PV 

None 

 

1.  Turn the inverter off and then back on using the main switch. 

2.  If the error remains, contact your installer. 

03 

DC bus voltage falls below the lower 

threshold 

None 

 

1.  Turn off the inverter using the main switch. 

2.  Measure the voltage at the battery and at the cabling above and below the 

battery disconnect to make sure voltage is within 44 to 58Vdc. 

3.  If the voltages are in range, check if the battery went into protection mode. 

4.  Turn the inverter on. If the error remains, contact your installer. 

04 

Parallel setting is not correct 

None 

 

1.  Check the parallel setting and mode setting. 

2.  Check the communication cable between stacking system. 

3.  Turn the inverter off and then back on using the main switch. 

4.  If the error remains, contact your installer. 

05 

Battery discharging current exceeds 

the upper threshold 

On: 1s 

Off: 1s 

 

1.  Turn off the inverter using the main switch. 

2.  Make sure the Grid and Load terminals are wired properly.  

3.  Turn the inverter on. If the error remains, contact your installer. 

06 

Battery charging current exceeds the 

upper threshold 

On: 1s 

Off: 1s 

 

07 

Short circuit on PV1 input 

None 

 

1.  Turn the inverter off and then back on using the main switch. 

2.  If the error remains, have your installer check the PV array for short circuits. 

08 

Short circuit on PV2 input 

None 

 

09 

Short circuit on AC

 

output  

Continuous 

 

5.  Turn off the inverter using the main switch. 

6.  Turn off the load breaker. 

7.  Make sure L1, L2 and N on the load circuit are not shorted. 

8.  Turn the inverter on. If the error remains, contact your installer. 

10 

Leakage current CT fault 

None 

 

1.  Turn off the inverter using the main switch. 

2.  Turn the load breaker off. 

3.  On the essential loads, check all appliances are not leaking current. If so, unplug 

the appliance safely. 

4.  Turn the inverter on. If the error remains, turn the Grid and PV breakers off. 

  On the PV side, measure and make sure the impedance of PV1+, PV1-, PV2+ 

and PV2- to ground and to each other should be an open circuit.  

  On the Grid side, measure and make sure the impedance of L1, L2 and N 

relative to ground and to each other should be an open circuit. 

5.  Turn the inverter off, then back on. If the error remains, contact your installer. 

11 

DC/DC Current Sensor fault 

None 

 

1.  Turn the inverter off and then back on using the main switch. 

2.  If the error remains, contact your installer. 

13 

PV Current Sensor fault 

None 

 

14 

EEPROM read failure 

None 

 

15 

Communication with main & secondary 

controllers are interrupted 

None 

 

16 

Over temperature fault 

On: 1s 

Off: 1s 

 

1.  The internal temperature is too high.  

2.  Make sure the inverter is properly ventilated by removing any obstruction around 

the vents. 

3.  Make sure the fans are working.  

4.  Turn off the inverter using the main switch and let it cool down for 10 minutes 

before turning it back on. 

5.  If the error remains, contact your installer. 

17 

PV input voltage exceeds the upper 

threshold 

None 

 

1.  If the PV V

OC

 is higher than 500VDC, contact your installer. 

2.  If the PV V

OC

 is less than 500VDC, turn off the inverter and restart it after 5 

seconds. If the error remains, contact your installer.  

18 

Over power protection 

On: 0.25s 

Off: 0.75s 

 

1.  The Grid/ Load power has been over 7.5kW for 30s. 

2.  Turn off the inverter using the main switch. 

3.  Make sure the load is lower than 5kW 

4.  Turn the inverter on using the main switch. 

5.  If the error remains, contact your installer. 

19 

PV insulation resistance is too low 

None 

 

1.  Turn off the PV breaker. 

2.  Check if the impedance between positive and negative poles to the ground is 

greater than 1MΩ. 

3.  If the impedance is lower than 1MΩ, contact your installer. 

20 

Battery charging voltage is too high 

None 

 

1.  Turn off the inverter using the main switch. 

2.  Make sure the connection between battery and inverter has firm and solid 

contact. 

3.  Make sure the battery voltage is within manufacturer’s specifications. 

4.  Turn the inverter on. If the error remains, contact your installer. 

21 

Fan fault 

None 

 

1.  Turn the inverter off and then back on using the main switch.  

2.  Make sure the fans are working. If the error remains, contact your installer. 

 

 

 

C

ODE

 

F

AULT 

E

VENT

 

A

LARM

 

ICON 

S

OLUTION

 

22 

Overload 

On: 0.25s 

Off: 0.75s 

 

 

1.  The load exceeds available output power. This error will disappear once load is in 

a acceptable range. 

2.  If the overload occurs for more than 40 seconds, the inverter will automatically 

restart. The inverter only allows 3 overload restarts within 5-minute intervals. 

3.  If the inverter is constantly restarting due to overload, you should decrease your 

load. 

23 

PV input over power 

None 

 

1.  Make sure your PV arrays does not exceed 6.5kW. 

2.  Turn the inverter off and then back on using the main switch. 

3.  If the error remains, contact your installer. 

24 

Battery type is wrong

 

None 

 

1.  Set the correct battery type according to the battery installed to the system. 

2.  Turn the inverter off and then back on using the main switch.  

3.  If the error remains, contact your installer. 

Содержание EverVolt Standard EVAC-105-4

Страница 1: ...V 01012021 Installation Service Manual FOR AC AND DC COUPLED EVERVOLT SYSTEMS...

Страница 2: ...LT STANDARD 11 KWH DC COUPLED SYSTEM EVDC 105 6 EVERVOLT PLUS 17 KWH DC COUPLED SYSTEM ONLY CERTIFIED EVERVOLT INSTALLERS SHALL BE ABLE TO PURCHASE DESIGN SELL AND INSTALL AN EVERVOLT SYSTEM THE 10 YE...

Страница 3: ...n in this document is subject to copyright and other intellectual property rights of Panasonic Life Solutions Company of America This material may not be modified reproduced or copied in whole or in p...

Страница 4: ...b 49 8 Connecting the SmartHub to the Internet 53 9 SmartHub Monitoring Portal 54 10 SmartHub Techincal Specifications 56 11 Operational Testing 57 12 Finshing Touches 59 Part II Users Guide 13 Operat...

Страница 5: ...utility depending on the mode the homeowner has selected To accommodate various power situations the EverVolt is designed to handle continuous power from PV panels batteries and the utility When the M...

Страница 6: ...continuous use during utility outages To facilitate easy installation the AC Coupled EverVolt s distribution box includes quick disconnect terminals DC and battery disconnects AC breakers battery conn...

Страница 7: ...safety hazards or cause damage to this product CAUTION This indicates the risk of a hot surface The surface may reach a temperature high enough to cause serious burn injuries General Precautions CAUT...

Страница 8: ...aged or substandard wiring CAUTION Under high temperature environment the cover of this inverter could be hot enough to cause skin burns if accidentally touched Ensure that this inverter is away from...

Страница 9: ...ire stove or heated place Do not impact the battery pack or throw it Do not use a damaged and or deformed battery pack Do not drive sharp objects into the battery pack strike it with any object or sta...

Страница 10: ...rVolt to liquids or flooding Do not expose of equipment or batteries with household waste Do not dispose of batteries in a fire or by burning The batteries can explode WARNING Risk of electric shock R...

Страница 11: ...t lightning and resulting voltage surge must be in accordance with local standards Using unapproved attachments or accessories could result in damage or injury Use Class 1 wiring methods for field wir...

Страница 12: ...rage and transport keep the inverter Properly ventilated Away from water other liquids heat sparks and direct sunlight Away from excessive dust corrosive and explosive gases and oil smoke Away from di...

Страница 13: ...ic com In case of fire or smoke Fire involving Lithium ion batteries can be extremely dangerous Lithium ion batteries can flash fire or explode Close doors as you leave to confine fire as much as poss...

Страница 14: ...rs Planning for Installation What s in the Box Assembly Installing the Battery Enclosure Battery Wires Mounting the Inverter PV Module Connection DC Coupled Connections General Grid Utility Connection...

Страница 15: ...________ Inverter 2 S N if applicable _____________________________ Inverter 3 S N if applicable _____________________________ Battery Module 1 _____________________________ Battery Module 2 _________...

Страница 16: ...rest on the feet of the battery enclosure b a conduit between the battery and inverter be placed for easy routing of the 1 0 or 2 0 wire The clearance spacing needs to be observed to allow for adequa...

Страница 17: ...he battery enclosure Required Tools Below is a list of recommended tools you will need to install EverVolt PARTS NAME DESCRIPTION QTY Gloves Cotton glove with urethane coating 1 Pair Automatic Screw d...

Страница 18: ...l What s in the Box What s in the Box Parts Description 1 Battery Enclosure 2 Inverter 3 Enclosure Mounting Bracket 4 SmartHub 5 Wood Screws 6 Inverter Mounting Bracket Screws 7 Inverter Mounting Brac...

Страница 19: ...0CM 8IN OF CLEARANCE TO THE SIDES AND 50CM 20IN TO THE TOP of the unit for proper air circulation to dissipate heat The ambient temperature charging must be between 5 C and 50 C and discharging 10 C a...

Страница 20: ...20 Installation Manual Installing the Battery Enclosure More 2 Remove the 6 screws from the front portion of the enclosure with a 4mm allen wrench 3 With two people remove front cover and set aside...

Страница 21: ...he Battery Enclosure More 4 Place mounting bracket onto predetermined wall for installation and ensure that the bracket is 59 above the ground 5 Determine what type of wall you re working with to use...

Страница 22: ...he slots line up correctly To assure that the weight of the battery rests firmly on the floor leave a 1 4 gap between the enclosure and the wall mounting bracket 7 Unscrew the battery hold downs withi...

Страница 23: ...ou have Note that the batteries must be placed on their side with the Positive side DOWN and the Negative side UP 9 Place battery hold downs over battery and screw them down Image above Battery orient...

Страница 24: ...56 75 8 AWG 4 Red 4 Black Black 42 25 Red 37 10 Locate your wiring harness kit Grab the negative and positive wires Use 6 AWG top batteries and 8 AWG bottom batteries Refer to the table below for mor...

Страница 25: ...set screw before tightening and checking that the stripped wire completely protrudes past the set screw hole Secure to the screw to the torque value listed below Marathon Terminal Block Torque Specifi...

Страница 26: ...tallation Manual 11 Feed the positive wiring through the enclosure as shown in the picture below 12 Use 6 AWG for top row bank Use 8 AWG for middle and bottom row banks Installing the Battery Enclosur...

Страница 27: ...ects to the inverter Ensure there is a star washer in between the ground cable and screw 14 Connect the appropriate sized wire between the Terminal Block and the battery lugs within the inverter to ha...

Страница 28: ...28 Installation Manual 15 The finished installation will resemble the image below Once complete place the cover back onto the battery enclosure Installing the Battery Enclosure More...

Страница 29: ...screws and this installation manual The following considerations must be taken into account before selecting where to install The unit cannot be mounted on flammable construction materials The unit m...

Страница 30: ...ed 604mm 23 8in Mounting the Inverter 1 Mount the backplate onto the wall using at least two screws one on each side of the backplate NOTE The DC coupled inverter bracket dimensions are all the same a...

Страница 31: ...lation Manual 2 Install the brackets on the inverter 3 Hang the inverter onto the backplate and secure the brackets to the wall using at least two screws one on each side of the inverter Mounting the...

Страница 32: ...emoved when making or modifying connections in the distribution box and reinstalled when connections have been completed To remove the cover use the following steps Reverse the steps to reinstall the...

Страница 33: ...PV MODULE CONNECTION DC Coupled Only NOTE Below information is for reference only See Technical Bulletin for additional string sizing information There is a DC PV circuit breaker in the distribution...

Страница 34: ...ent to the inverter For example non grounded PV modules will cause leakage current to the inverter CAUTION To reduce the risk of injury use the proper cable size for PV module connection CAUTION To re...

Страница 35: ...t the risk of electric shock make sure the ground wire is properly earthed before operating this unit whether the grid is connected or not To reduce the risk of injury use the recommended wire cable s...

Страница 36: ...reaker labeled FROM INVERTER is for normal inverter operation The other breaker labeled FROM GRID bypasses the AC GRID breaker and connects the essentials loads directly to the Grid Input terminals No...

Страница 37: ...nal automatic transfer switch Direct connection of essential loads output to the grid will result in damage to the inverter WARNING Do not connect essential loads output in parallel with the grid Conn...

Страница 38: ...er Do not install wires into PV Inputs for AC Coupled installations PV Input Grid Input Load Ouput AC Input II PV Input Grid Input Load Ouput AC Input II CAUTION DO NOT USE PV INPUT TERMINALS ON AC CO...

Страница 39: ...thin the operation AC voltage range of the product s specifications Step 2 Make sure the circuit breaker is off Step 3 For each AC wire strip 15mm 0 6in of insulation Step 4 Connect the AC wires to th...

Страница 40: ...n off the 40 A marked main grid breakers located in the main service panel Step 2 Turn off the battery breaker located in the inverter distribution box Step 3 Turn off both interlocked Load Input Sele...

Страница 41: ...may include 1 NEC 690 31 G for DC PV circuits in buildings 2 NEC 215 12 C 2 for correct DC wiring coloring 3 NEC TABLE 310 15 B 16 for Allowable Ampacities of Insulated Conductors for Not More Than T...

Страница 42: ...ual Battery Connection Charging Information Connect DC Power Step 1 Make sure the inverter battery circuit breaker is OFF Step 2 Make sure the battery pack ON OFF switch is OFF Note Press Rocker Switc...

Страница 43: ...performed with care due to high battery current Inverter Battery Connection Step 3 Strip 15mm 0 6in of insulation from each battery cable and insert it into a ring lug See Cable Length table above fo...

Страница 44: ...4 Installation Manual Battery Connection Charging Information Connecting to Battery Terminals Connect the red cable to the positive battery terminal and the black cable to the negative battery termina...

Страница 45: ...le and bottom batteries CAUTION Before making the final connection or closing the breaker make sure the connections have the correct polarity Check polarity labels above CAUTION Do NOT apply anti oxid...

Страница 46: ...cable from the inverter into battery enclosure per AHJ requirements 3 Connect the other end of the supplied battery communication cable to upper outer battery RJ 45 connector labeled UP 1 Connect the...

Страница 47: ...battery module from the LOW to UP with the Ethernet RJ 45 cables Up to 12 total modules may be string together 4 Position all the four sliders to the ON position for all the batteries to the Slave no...

Страница 48: ...nformation 7 To read the battery status and state of charge SOC please refer to the following diagram and table shown below SOC LED Indicator SOC Display Switch Status Indicator Battery Status Display...

Страница 49: ...er there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by tur...

Страница 50: ...for a LAN connection 3G 4G Connect a 3G 4G dongle for a cellular connection DATA USB flash drive T0 RS485 Connects to the inverter for two way communication T1 RS485 External RS485 sensor device reser...

Страница 51: ...ead screwdriver to tighten the screws Step 2 Open the door on the inverter and remove the dead front cover if needed See inverter manual for instructions Look inside and on the top bulkhead panel you...

Страница 52: ...r Cellular NOT INCLUDED LAN Connection PREFERRED Connect the ethernet cable to the SmartHub and to the network router Cellular Connection NOT INCLUDED Connect a non password protected 3G 4G dongle to...

Страница 53: ...near the installed EverVolt 3 Run a CAT5 6 cable from the SmartHub to the PLC 4 Place the second PLC next to the customer s router 5 Run a CAT5 6 from the PLC to the customer s router 6 For full insta...

Страница 54: ...then click the Add button Step 3 Complete the all required fields denoted by then click Save button at the bottom of the page Note To display this site on Google Maps click the Get GPS Location butto...

Страница 55: ...d Energy Comparison The homeowner will have the ability to change the operating mode via the smartphone app The homeowner must be trained on what changes can be made as incorrect or random changes can...

Страница 56: ...USB 2 0 Type A 8G Flash Drive Included POWER Power Supply Input 12Vdc 2Adc Power Consumption 9 to 36Vdc 5W Typical MECHANICAL DATA Dimensions WxHxL 99x28x147mm 3 9x1 1x5 8in Weight 0 17kg 0 37lb Inst...

Страница 57: ...4 Turn ON the Main Switch located on the left side of the inverter 5 If the inverter has PV DC Coupled EverVolt Only or GRID input then the system will automatically start If only battery starts the i...

Страница 58: ...e connections a Power 5 VDC plug into the essential loads b Communication cable SmartHub RS485 to Inverter RS 485 S c Ethernet cable from your internet source to the SmartHub or wifi connection Step 3...

Страница 59: ...vity Options Maintenance Cleaning Service Troubleshooting Installing and Replacing Additional Batteries Specifications Grid Support Parameters UL1741SA EverVolt Limited Warranty 12 FINISHING THE INSTA...

Страница 60: ...s of four function keys and an LCD screen The display panel will be used to manage and monitor the system ICON FUNCTION DESCRIPTION Enter Confirm the selection in setting mode or enter setting mode ES...

Страница 61: ...6 Check Load AC output voltage L L 240 VAC L N 120 VAC Step 7 Turn on Load Breaker in the distribution box Operation and Display Panel To Start Up Equipment Overview How to Turn the System On Grid tie...

Страница 62: ...t away if the batteries SoC is not high enough In that case 1 reduce the essential load or 2 wait for either the grid voltage to return or for enough solar power and battery SoC to operate the essenti...

Страница 63: ...ff the battery breaker located inside the Distribution Box behind the thumb screw latched access door 4 DC Coupled only Turn off the PV Switch located outside the inverter enclosure on the left side 5...

Страница 64: ...will display three different pages Power Flows Power Information and System Settings Use the or keys to toggle between the various pages The screen will default to the Power Flows page Power Flow Page...

Страница 65: ...65 Installation Manual Operation and Display Panel...

Страница 66: ...The inverter has six modes of operation for backup residential and time of use Each mode assumes a set of conditions and prioritizes the consumption of PV Grid or batteries accordingly to optimize en...

Страница 67: ...anel use or keys to get to the System Setting Page System settings are divided into two parts Mode and Time Setting Click to enter the System Setting Page and click ESC to exit Step 1 In the System Se...

Страница 68: ...the number and then to set it Once the value for the last time field is set press the key Operation and Display Panel Step 4 Settings are being updated Please wait for next message Step 5 Press any k...

Страница 69: ...nd then press The date format is DD MM YYYY and the time format is hh mm ss Use the key to toggle between the date fields and the or keys to select the values Once the value for the last date field is...

Страница 70: ...s and select Panasonic and press to select it Press any key and manually restart with the main switch located on the left side of the inverter Step 2 Use the or keys to select Battery Type and to sele...

Страница 71: ...asure and make sure the impedance of L1 L2 and N relative to ground and to each other should be an open circuit 5 Turn the inverter off then back on If the error remains contact your installer 11 DC D...

Страница 72: ...k the battery BMS errors and the wiring 3 Turn the inverter off and then back on using the main switch 4 If the error remains contact your installer On the Power Flows Page the icon will flash when th...

Страница 73: ...re two PCB boards 1 Left side Communication board is used for parallel and display communication 2 Right side External RS485 board is used for primary RS485 communicated with battery and secondary RS4...

Страница 74: ...RIPTION REMARKS 1 AUX PORT FOR GENERATION FUNCTION 2 EXTERNAL DISPLAY PORT FOR H100 H200 CABINET USE 3 PARALLELED COMMUNICATION PORT FOR INVERTER PARALLELED FUNCTION 4 BOOT LOAD AND COMMUNICATION JUMP...

Страница 75: ...er pins on Tx 2 and Rx 2 Step 4 The inverter needs to connect the power either choices PV Battery or Grid Then use the application software setting your parameters Configuring the Hardware U S B p o r...

Страница 76: ...76 Installation Manual Configuring the Hardware PV INPUT IS ONLY USED FOR EVERVOLT DC COUPLED SYSTEM...

Страница 77: ...TERMINALS 240V 120V 60HZ SPLIT PHASE SYSTEM USA Grid and Load Terminals L1 L2 N GND Black Red White Green 240V 120V 60HZ SPLI T PH A SE SY STEM U SA L1 L1 L2 L2 GND N N L1 N L2 GND 120V 120V 240V 120V...

Страница 78: ...ted to bond the neutral and ground at the main electrical panel Generator Sizing Available generator power may be limited by ratings for circuit breakers and or generator connectors The maximum allowe...

Страница 79: ...or Optional Package Contents Component check list Item Component Picture Amount Unit Remark 1 Magnetic Relay 1 Set 2 Thermal Relay 1 Set 3 Generator power Wire 10 AWG 1 Set 4 Control Wire 1 Set 5 Stri...

Страница 80: ...80 Installation Manual Generator Optional Wiring diagram for generator application The wiring of the D05 with Magnetic contactor for generator application are shown below...

Страница 81: ...ion Manual Generator Optional Generator Installation Step 1 Combine the Magnetic Relay and Thermal Relay by using the screwdriver as follow picture red mark Step 2 Install the Magnetic contector on th...

Страница 82: ...2 Installation Manual Generator Optional Step 4 Connect the control wire UNIT CONDITION 12VDC SOURCE DRY CONTACT Power Off Unit is off and no output is powered 0 Vdc Open Step 3 Connect the power wire...

Страница 83: ...83 Installation Manual Step 5 Install the Generator wire...

Страница 84: ...d 12Vdc power supply and can supply up to 0 25A The Relay AUX terminals are dry contacts with no voltage and can conduct up to 7A and up to 250Vac Function Signal Description Power On Grid Available B...

Страница 85: ...85 Installation Manual Internet Connectivity Options 17 INTERNET CONNECTIVITY OPTIONS Approved cell modem options Any LTE Broadband Router with Ethernet ports...

Страница 86: ...86 Installation Manual Internet Connectivity Options Typical PLC Options PLC INCLUDED WITH EVERY EVERVOLT SYSTEM...

Страница 87: ...ules must be observed 1 All AC breakers must be sized for 40A or less and 2 All wiring must be sized for 40A or more NOTES EverVolt has L1 and L2 connections for two AC input sources although it can o...

Страница 88: ...TTERY DISCONNECT and all AC breakers located inside the Distribution Box behind the thumb screw latched access door To enable Lock Out Tag Out per the Standard for Electrical Safety in the Workplace N...

Страница 89: ...s given in Replacement Battery Information sheet in the box with the Replacement Battery ies This is accomplished by charging or discharging the battery until SoC on Dashboard matches the SoC on the R...

Страница 90: ...enough to get a good hold on it WARNING Proper disposal of lithium ion battery ies is required Contact the battery manufacturer for further instruction on how to dispose of batteries Within every cit...

Страница 91: ...ditional Batteries To make the battery parallel connection use either Polaris Connectors from your local electrical store or Bay Marine BusBar Dual 4 Post Power Distribution Block 3 8 3 8 available on...

Страница 92: ...120V 3 L L 240V 3 Total harmonic distortion THD at rated power 5 Power Factor 99 AC INPUT FROM GRID GRID SUPPORT AC Input Voltage Limits Bypass L L 180 to 280V 240 V nominal Automatic Transfer Relay R...

Страница 93: ...es STANDARD COMPLIANCE Safety UL9540 UL1973 UL1741SA CSA 22 2 Grid Connection Standards IEEE 1547A IEEE 1547 1 Emissions FCC part15 class B Standards Rule 21 HECO Specifications AC OUTPUT TO LOAD WITH...

Страница 94: ...Standards Rule 21 HECO EFFICIENCY Peak Battery to Grid 94 7 System Standby Power 20W System Idle Power 8W AC INPUT FROM GRID GRID SUPPORT Automatic Transfer Power Rating Typical Transfer Time 7000W 20...

Страница 95: ...nge is between 120Vac and 168Vac LV3 V 50 1 5 sec Trip time when the voltage is below 120Vac PARAMETER RATING DESCRIPTION VDC op 120 500V Max input voltage VDC mppt 250 430V Maximum power point track...

Страница 96: ...ive Power Production Capacitive Overexcited Qunder ind max 3 57 VA Maximum Rated Reactive Power Absorption Inductive Underexcited VAslope max 148 VA V Maximum slope of power over voltage Dmin Dmax 235...

Страница 97: ...DESCRIPTION Normal Operating Soft Start 1 Irate sec 1 Irate sec 50 Irate sec 50 Irate sec 3 3 Percentage of nominal generated power per second Percentage of nominal generated power per second for the...

Страница 98: ...xx with colons between every two characters For example if the LAN MAC is 40D63C031E86 it should be entered as 40 D6 3C 03 1E 86 Step 3 If the SmartHub is connected to the router via a LAN connection...

Страница 99: ...ions battery storage All Rights Reserved 2020 COPYRIGHT Panasonic Corporation Specifications are subject to change without notice Panasonic Life Solutions Company of America Two Riverfront Plaza 5th F...

Отзывы: