TEST AND MEASUREMENT
MCUK011201C8
Section 6
Issue B
Service Manual
– 33 –
Revision 0
6.4.
Complete Unit Setup
6.4.1
Connection Diagrams
Figure 6.6: Test Connection Diagrams
IMPORTANT NOTE
To allow accurate measurement of the complete unit the test equipment must be connected as shown. The PCB Test Setup
must be used to enable repair to PCBs. Once repair / replacement is complete, the assembled unit must be tested and
calibrated using the Complete Unit Test Setup.
+12V POWER SUPPLY
INTERFACE BOX
PC
RS232
PCB REPAIR JIG
GSM TESTER
RF CABLE
+12V POWER SUPPLY
INTERFACE BOX
PC
RS232
GSM TESTER
RF CABLE
UNIT UNDER TEST
RF ADAPTOR
PCB TEST SETUP
COMPLETE UNIT TEST SETUP
10516-1