Step 20: Make sure the trigger link spring is hooked underneath
the catch.
•
Assembly of Change Lever and Change Gear
Step 21: Slot the change gear onto the change lever.
Step 22: Align change gear to the shaft and snap both bosses
of the change lever to the hooks.
•
Assembly of Cam Gear
Step 23: Adjust both parts to align with the underneath holes.
Step 24: Align the holes and press down until it “click”.
52
CR14
Содержание CR14
Страница 2: ...1 Mechanism Overview 2 CR14 ...
Страница 7: ...7 CR14 ...
Страница 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14 ...
Страница 13: ...8 2 Jig s Flow Diagram 13 CR14 ...
Страница 14: ...8 2 1 Flow operation 14 CR14 ...
Страница 15: ...15 CR14 ...
Страница 57: ...Step 8 Install OC assy Step 9 Install OC spring 57 CR14 ...
Страница 60: ...CR14 60 ...
Страница 64: ...CR14 64 ...
Страница 65: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14 65 ...
Страница 66: ...CR14 66 ...