Step 5: Use a flathead screwdriver slot into the gap and push
out the tray lock lever as arrows shown.
Step 6: Push the trays towards the front as arrow shown.
Step 7: Push the catch and slide the UD cam R guide as arrows
shown.
Step 8: Turn over the unit and detach the FFC wires from the
adhesive areas.
27
CR14
Содержание CR14
Страница 2: ...1 Mechanism Overview 2 CR14 ...
Страница 7: ...7 CR14 ...
Страница 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14 ...
Страница 13: ...8 2 Jig s Flow Diagram 13 CR14 ...
Страница 14: ...8 2 1 Flow operation 14 CR14 ...
Страница 15: ...15 CR14 ...
Страница 57: ...Step 8 Install OC assy Step 9 Install OC spring 57 CR14 ...
Страница 60: ...CR14 60 ...
Страница 64: ...CR14 64 ...
Страница 65: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14 65 ...
Страница 66: ...CR14 66 ...