Step 17: Fix Switch rod, ensure the switch rod’s guide seat
properly onto the groove.
•
Assembly of Traverse Unit Assy
Step 18: Slide TRV slide plate assy to the end.
Step 19: Turn over the UD base, release catch and push the
guide of the TRV slide plate as arrows shown.
Step 20: Ensure both grooves are open.
Step 21: Ensure the OPU sub rack is below the guide line.
44
CR14
Содержание CR14
Страница 2: ...1 Mechanism Overview 2 CR14 ...
Страница 7: ...7 CR14 ...
Страница 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14 ...
Страница 13: ...8 2 Jig s Flow Diagram 13 CR14 ...
Страница 14: ...8 2 1 Flow operation 14 CR14 ...
Страница 15: ...15 CR14 ...
Страница 57: ...Step 8 Install OC assy Step 9 Install OC spring 57 CR14 ...
Страница 60: ...CR14 60 ...
Страница 64: ...CR14 64 ...
Страница 65: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14 65 ...
Страница 66: ...CR14 66 ...