PIPING INSTALLATION
3
TO DRILL A HOLE IN THE
WALL AND INSTALL A
SLEEVE OF PIPING
2
1. Make a Ø70 mm through hole.
2. Insert the piping sleeve to the hole.
3. Fix the bushing to the sleeve.
4. Cut the sleeve until it extrudes about 15 mm from the wall.
CAUTION
When the wall is hollow, please be sure to use the sleeve for
tube assembly to prevent dangers caused by mice biting the
connection cable.
5. Finish by sealing the sleeve with putty or caulking compound
at the fi nal stage.
15 mm
Putty or caulking compound
ø70 mm through hole
Indoor
Outdoor
Sleeve for tube
assembly
Approx. 5 - 7 mm
Bushing for tube assemblys
Wall
Typical Piping Installation
Open and Close Front Plate
e
1. Remove the 2 mounting screws of Bottom Front Plate
e
.
2. Slide it upwards to unhook the Bottom Front Plate
e
hook.
3. Reverse above steps 1~2 for close it.
Refrigerant Piping Installation
This Tank Unit is designed for combination with Panasonic Air-to-Water
Heat Pump Outdoor Unit. If Outdoor Unit from other manufacturer
are being used in combination with Panasonic Tank Unit, optimum
operation and reliability of the system is not guaranteed. Thus warranty
cannot be given in such case.
1. Connect Tank Unit to Air-to-Water Heatpump Outdoor Unit with
correct piping size.
Model
Piping size (Torque)
Tank Unit
Outdoor Unit
Gas
Liquid
ADC0916H9E8
WH-UX09HE8 /
WH-UX12HE8 /
WH-UX16HE8 /
WH-UD09HE8 /
WH-UD12HE8 /
WH-UD16HE8
ø15.88mm (5/8")
[65 N•m]
ø9.52mm (3/8")
[42 N•m]
Spanner
Torque
wrench
Access to Internal Components
WARNING
This section is for authorized and licensed electrician/water system
installer only. Work behind the front plate secured by screws
must only be carried out under supervision of qualifi ed contractor,
installation engineer or service person.
CAUTION
Open or close the Front Plate carefully.
The heavy Bottom Front Plate may injures
the fi ngers.
Hook
2X (screw)
Main
Water
Supply
Faucet
Fan Coil Unit
2-Way Valve
Tab /
Shower
Air-to-Water Heatpump
Outdoor Unit
Pressure
Relief
Valve
Drainage
Expansion
Vessel
Radiator /
Floor Heater
Tank Water
Discharge
Tundish
Pressure
Reducing
Valve
Shut
Off
Valve
Check
Valve
Drain
Water
Transport and Handling
•
Be careful during transportating the unit so that it is not damaged
by impact.
•
Only remove the packaging material once it has reached it is
desired installation location.
•
It may need three or more people to carry out
the installation work. The weight of Tank Unit
might cause injury if carried by one person.
•
The Tank Unit can be transported either in
vertical or horizontal.
-
If it transported in horizontal, make
sure Front of packaging material
(printed with “FRONT”) must facing
upwards.
-
If it transported in vertical, use the
hand holes on sides, slide and
move to the desired location.
•
Fix the Adjustable Feet
1
, if the Tank unit installed on a uneven
surface.
Hold
Hold
Hold arrow section
to slide and move
Required space for installation
(Unit : mm)
Min.
100
Min.
700
Min.
300
Min.
100
Min.
100