Palram solid APUS 1.2x0.8 Скачать руководство пользователя страница 42

Declaration of Performance

According to Construction Products Council Directive UE N°305/2011 and EN 14963:2006

Issue Date 01/01/2022

1. 

Identification code: 

Apus

, refer to CE label no 007 

2. 

Type: A light transmitting wall-supported Twin-wall PC roofing structure with upstand made of polymer and 

aluminum elements

3.  Intended use: open multi-purpose covering
4. 

Manufacturer: Palram 

Canopia

 Ltd. Teradion Industrial Park, M.P Misgav 2017400, P.O.B. 53, Israel

5.  Importer and EU representative : PALRAM Applications UK, Unit 40 J3 Industrial Estate Carr Hill,  

Doncaster  DN4 8DE   

6. 

Assessment and verification of constancy of performance: System 3

7. 

Declared performance:

Resistance to upward load: UL 350
Resistance to downward loads: DL 600

Reaction to fire: B, s1, d0 

 

For mounting and fixing provisions see EN 16153:2013

Resistance to fire: NPD

External fire performance: F

ROOF

Water tightness:

 

For the rooflight with upstand: Pass

 

For the sheet material: Pass

Impact resistance:

 

For the small hard body: Pass

 

For the large soft body: NPD

Thermal transmittance:

 

For the rooflight: NPD (not relevant to an open multi purpose cover)

 

For the sheet material: 3.6 W/(m²•K)

Direct airborne sound insulation: NPD (not relevant to an open multi purpose cover)

Radiation transmittance:

 

- Light transmittance: Tv - 82.0 %

 

- Solar direct transmittance: Te - 72.7 %

 

- Solar factor: g value - 0.75 

Air permeability:

 

For the rooflight: NPD  (not relevant to an open multi purpose cover)

 

For the sheet material: Pass

Durability (of the sheet material): ΔA, Cu 1, Ku 1

8. 

The performance of the product identified in points 1 and 2 is in conformity with the declared performance in point 7.

 

This declaration of performance is issued, in accordance with Annex ZA.2.2 – EN 14963:2006, 

 

under the sole responsibility of Palram Canopia Ltd.

 

ITT reports and Factory Production Control records are available upon request at www.canopia.com

Signed for and behalf of Palram Canopia Ltd. by: 

 

Teradion Industrial Park, M.P Misgav 2017400, P.O.B 53, Israel

01/01/2022

601367

Palram Canopia Ltd.

Teradion Industrial Park, M.P Misgav 2017400, P.O.B 53, Israel
Tel +972.4.848.6900  |  Fax +972.4.848.6901
[email protected]  |  www.canopia.com

Содержание solid APUS 1.2x0.8

Страница 1: ...SEMBLE RECYCLABLE EN 14963 200 6 FR Please read these instructions carefully before starting assembly Keep these instructions in a safe place for future reference IMPORTANT CUSTOMER SUPPORT 0180 522 8...

Страница 2: ...it Level Wrench 13 mm 1 2 Philips head Screwdriver Pencil Electric Drill With Drill Bit 10mm 13 32 Ladder Tape measure 2 5x4 0 8x1 2 2 5x8 0 8x2 4 2 5x12 0 8x3 6 PRIMARY UNIT 2 5x4 0 8x1 2 1 BOX PRIMA...

Страница 3: ...ded to prevent a pro le from sliding out Tighten all screws once assembly is completed CARE MAINTENANCE When your product needs to be cleaned use a mild detergent solution and rinse with cold clean wa...

Страница 4: ...r les crous ou non Il peut tre n cessaire de serrer temporairement certaines vis pour emp cher un pro l de se d placer Serrez toutes les vis une fois l assemblage termin ENTRETIEN MAINTENANCE Pour net...

Страница 5: ...eile ber ssig sein Diese 2 Symbole unten zeigen an ob das Anziehen der Schrauben erforderlich ist oder nicht Das vor bergehende Anziehen einiger Schrauben kann erforderlich sein um ein Herausrutschen...

Страница 6: ...el montaje CUIDADOS MANTENIMIENTO Cuando precise limpiar su producto use una soluci n de detergente suave y aclare con agua limpia fr a NO use acetona limpiadores abrasivos u otros detergentes especi...

Страница 7: ...SILICONE LUBRICANT SPRAY UV THIS SIDE OUT Extension Kit 2 HE...

Страница 8: ...r s kruvar vara n dv ndigt f r att f rhindra att en pro l faller ner Drag t alla skruvar islutet av monteringen RENG RINGSINSTRUKTIONER Vid reng ring av produkt anv nd ett milt reng ringsmedel och sk...

Страница 9: ...uer n r du er ferdig med monteringen VEDLIKEHOLD OG RENGJ RING Rengj r produktet med mildt rengj ringsmiddel og skyll med kaldt vann Bruk ikke aceton slipende rengj ringsmidler eller andre kjemikalier...

Страница 10: ...irist ruuveja vai ei Joissakin vaiheissa muutaman ruuvin v liaikainen kiristys voi olla kuitenkin tarpeen tukirangan kaatumisen est miseksi Kirist kaikki ruuvit asennuksen lopuksi PUHDISTUSOHJEET Puhd...

Страница 11: ...erne skal strammes eller ej Midlertidig tilsp nding af et par skruer kan v re n dvendig for at forhindre at en pro l glider Stram alle skruer n r du er ferdig med monteringen RENG RINGSVEJLEDNING Anve...

Страница 12: ...Maak het product schoon na assemblage SCHOONMAAK INSTRUCTIES Om de Artikel schoon te maken gebruik slecht milde reinigers en spoel dit af met schoon en koud water Gebruik geen aceton schurende deterg...

Страница 13: ...si sposti fuori posto Stringi tutte le viti al termine del montaggio ISTRUZIONI PER LA PULIZIA Per pulire il Prodotto utilizzare un detergente delicato e risciacquare con acqua pulita fredda Non utili...

Страница 14: ...hnutie nieko k ch skrutiek m e by potrebn Na konci mont e pros m dotiahnite v etky skrutky POKYNY NA ISTENIE Na vy istenie v robku pou ite jemn roztok sapon tu s vodou a opl chnite ho istou studenou v...

Страница 15: ...v da pro l ne zdrsne ven Ko je sestavljanje kon ano zategnite vse vijake NAVODILA ZA I ENJE Za i enje izdelka uporabite blago raztopino detergenta in sperite s hladno isto vodo Za i enje plo ne uporab...

Страница 16: ...vi ajutine pingutamine Pinguldage kruvid alles siis kui toodet on komplekteeritud PUHASTUSJUHISED Toote puhastamiseks kasutage pehmet pesuvahendilahust ja k rige toodet puhta k lma veega rge kasutage...

Страница 17: ...szor tani hogy a szelv ny ne tudjon leesni H zza meg az sszes csavart az sszeszerel s befejez se ut n TISZT T SI TMUTAT Amikor a term k tiszt t sra szorul haszn ljon enyhe tiszt t szeres oldatot majd...

Страница 18: ...Do czyszczenia produkt nale y u y delikatnego rodka czyszcz cego i sp ukiwa zimn wod Do mycia paneli nie u ywaj acetonu ciernych rodk w czyszcz cych ani innych substancji chemicznych Wyczy produkt po...

Страница 19: ...SILICONE LUBRICANT SPRAY THIS SIDE OUT Extension Kit 2 O RU...

Страница 20: ...Lai nov rstu pro la sl d anu var b t nepiecie ams slaic gi pievilkt da as skr ves Po kon ani sestavi zategnite vse vijake T R ANAS NOR D JUMI Lai t r tu produktu izmantojiet vieglu mazg anas l dzek a...

Страница 21: ...n kolika roub aby se zabr nilo vyklouznut pro lu Na konci mont e dot hn te v echny matice N VOD K I T N K i t n produkt pou vejte slab roztok sapon tu kter pot opl chn te studenou istou vodou K i t n...

Страница 22: ...zanje nekoliko vijaka kako bi se sprije ilo klizanje pro la Zategnite sve vijke kada je monta a zavr ena NJEGA I ODR AVANJE Kada va proizvod treba o istiti koristite blagu otopinu deterd enta i isperi...

Страница 23: ...tep 13 Adjust and center the panel before closing the screws FR PRINCIPALES TAPES D ASSEMBLAGE Lorsque vous rencontrez cette ic ne d information pendant l assemblage veuillez vous r f rer l tape d ass...

Страница 24: ...tonw nde geeignet sind Schritt 13 Justieren und zentrieren Sie das Platte bevor Sie die Schrauben festziehen ES PASOS DE MONTAJE IMPORTANTES Al encontrar este icono de informaci n durante el montaje c...

Страница 25: ...rligare kommentarer Steg 1 Planera monteringen i enlighet med antalet k pta sk rmtak Steg 2 Storlekar i enlighet med steg 1 Steg 4 Anv nd l mpliga skruvar och pluggar f r din specifika v ggtyp P ritni...

Страница 26: ...g plugger som er beregnet for betongvegger Trinn 13 Juster og sentrer panelet f r du strammer til skruene FI T RKE T ASENNUSVAIHEET Kun n et t m n tietokuvakkeen asennuksen aikana katso t rke t lis hu...

Страница 27: ...n 13 Juster og centr r panelet inden skruerne lukkes NL BELANGRIJKE STAPPEN VAN DE OPBOUW Wanneer u dit informatiepictogram tijdens de opbouw tegenkomt raadpleeg dan de betreffende stap van de opbouw...

Страница 28: ...a di muro Nel disegno sono mostrati viti e tasselli adatti ai muri in cemento Fase 13 Sistemare e centrare il pannello prima di stringere le viti SK D LE IT MONT NE KROKY Ke sa po as mont e stretnete...

Страница 29: ...vhodn pre bet nov steny 13 korak Pred zatv ran m skrutiek nastavte a vycentrujte panel ET OLULISED KOKKUPANEMISSAMMUD Kui n ete kokkupanemisel seda teabeikooni palun vaadake vastavat kokkupanemisetapp...

Страница 30: ...falt pushoz Az br n betonfalhoz alkalmas csavarokat s tipliket br zolunk 13 l p s Acsavarok megh z sa el tt ll tsa be s helyezze k z pre a panelt PL WA NE KROKI MONTA U Kiedy napotkasz tak ikon inform...

Страница 31: ...lai ieg tu svar gus papildu koment rus 1 solis Pl nojiet mont u atbilsto i ieg d to nojumu skaitam 3 solis Izm ri saska ar Soli 1 4 solis Izmantojiet j su sienas tipam piem rotas skr ves un aizb us Z...

Страница 32: ...dinky vhodn pro betonov st ny Krok 13 Nastavte a p ed uzav en m roubamy vycentrujte panel HR VA NI KORACI MONTA E Kada nai ete na ovu ikonu informacija tijekom sastavljanja pogledajte relevantni kora...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ...us signaliez la d faillance par crit dans les 30 jours suivant la d couverte du d faut Canopia remplacera sa seule discr tion les pi ces d fectueuses du produit ou vous remboursera une partie proporti...

Страница 39: ...dig en del af k bsprisen beregnet ved hj lp af den line re metode p grundlag af garantiens varighed SK 2 RO N OBMEDZEN Z RUKA I PALRAM CANOPIA Palram Canopia Ltd slo spolo nosti 512106824 ktorej s dlo...

Страница 40: ...ik nt h vihart rvizet vagy t zesetet A Canopia a v s rl st igazol bizonylat s a term k meghib sod s ra vonatkoz bizony t k beny jt sa eset n valamint a hiba szlel s t l sz m tott 30 napon bel l r sban...

Страница 41: ...vendicat i sub rezerva raport rii defec iunii n scris n termen de 30 de zile de la descoperirea defectului reclamat Compania Canopia la propria sa discre ie va nlocui p r ile defecte ale produsului sa...

Страница 42: ...he small hard body Pass For the large soft body NPD Thermal transmittance For the rooflight NPD not relevant to an open multi purpose cover For the sheet material 3 6 W m K Direct airborne sound insul...

Страница 43: ...souple pas de performance d termin e Transmission thermique Pour le d me de toit pas de performance d termin e non pertinent dans le cas d une toiture ouverte polyvalente Pour les mat riaux en feuille...

Страница 44: ...en K rper Pass F r den gro en weichen K rper NPD W rmeleitf higkeit F r die Lichtkuppel NPD nicht zutreffend bei offenen Mehrzweckabdeckungen F r das Plattenmaterial 3 6 W m K Direkte Luftschallisolie...

Отзывы: