6. Connect the carabiner on to the crossframe to the cable that has been lowered (Figure 15).
Figure 15
Carabiner attached to crossframe
7. To extend the cross frame arms, turn the knob on each arm and slide each arm to the four
tote corners. The cross frame arms should be adjusted so they are 15 – 20 mm from the tote
inner corners (Figure 16).
Figure 16
Knob turned to extend crossframe arm
8. Using the friction wheel, raise the crossbar inside the tote to prepare for biocontainer
installation (Figure 17).
Figure 17
Operator raising crossframe