background image

USD 3055

Instructions for Use

Allegro™ 3D Biocontainers and Allegro Totes
1000 L, 2000 L and 3000 L

Содержание Allegro 1000 L

Страница 1: ...USD 3055 Instructions for Use Allegro 3D Biocontainers and Allegro Totes 1000 L 2000 L and 3000 L ...

Страница 2: ...the hoist 7 4 3 Installation of the Allegro biocontainer system 10 4 4 Filling the Allegro biocontainer system 11 4 5 Draining the Allegro biocontainer 13 4 5 1 From the bottom 1000 L 2000 L and 3000 L 13 4 5 2 From the Top 1000 L only 13 4 6 Removing Allegro 3D biocontainer from the Allegro tote 13 5 Allegro Biocontainer Replacement 13 6 Troubleshooting Guide 13 7 Scientific and Laboratory Servic...

Страница 3: ...e the exterior of the Allegro biocontainers may in circumstances where significant stress repetitive bending and twisting is applied during use cause damage to the molded LDPE inlet and outlet ports The flexible LDPE film of the Allegro biocontainers is not affected 3 Receipt of Equipment Allegro 3D biocontainers are usually provided as part of an Allegro system that has been sterilized by gamma i...

Страница 4: ... installation of the Allegro base and extension module To prepare the tote for use 1 Check that the area designated for use is clear and can accommodate the hardware system being installed Ensure that the surface area is flat level and strong enough to bear the weight of the tote when full If required prepare studs for screwing the feet down Please refer to Table 1 for clearance 2 Using a forklift...

Страница 5: ... base modules feet are completely aligned with the holes on the stand frame so the bolts can be inserted Figure 4 Figure 4 Stand frame alignment with base module 5 Once the bolts on the base module are aligned with the holes on the stand slowly lower the fork lift to drop the bolts into place Figure 5 Figure 5 Bolts inserted into four holes www pall com biopharm 5 ...

Страница 6: ...0 L Attach the two lifting plates to the top of the extension module by dropping one end over a position pin and aligning the other side with a bolt into the hole Fasten down with a washer and nut and the adjustable wrench Figure 7 The lifting plates will be used to lift the extension module Figure 7 Lifting plate secured to top of extension module Attach crane or hoist carabiner to the two lockin...

Страница 7: ... bottom washers to secure the base module to the extension module Figure 10 Figure 10 Secure ten bolts with nuts and washers 4 2 Preparation and installation of the hoist 1 Attach the hoist bracket to the top of the extension module by placing each side of the bracket frame holes into the positioning pins Fasten the other hole on the bracket feet using a bolt with nut and washer Figure 11 This is ...

Страница 8: ...ning the two flat head screws secure it to the cable This will prevent the cable from disconnecting from the friction wheel Figure 13 Figure 13 Cable fastened by cable lock 4 Using a ladder pull the end of cable that has carabiner through large center pulley on hoist frame directly above extension module 5 Feed cable down from the center pulley until the stainless cable with carabiner attached is ...

Страница 9: ...ob on each arm and slide each arm to the four tote corners The cross frame arms should be adjusted so they are 15 20 mm from the tote inner corners Figure 16 Figure 16 Knob turned to extend crossframe arm 8 Using the friction wheel raise the crossbar inside the tote to prepare for biocontainer installation Figure 17 Figure 17 Operator raising crossframe www pall com biopharm 9 ...

Страница 10: ... biocontainer system 1 Confirm that the selected Allegro 3D biocontainer system is suited for the tote 2 Inspect the Allegro biocontainer system packaging Verify that it is free from damage that might compromise the integrity of the system 3 Remove the system from its packaging Do not unfold the Allegro biocontainer 4 Hold the Allegro 3D biocontainer with the port plate facing down at the bottom a...

Страница 11: ...iner Secure the lower swivel door and replace locking pin Attach the four hoist clips to the holes four holes located at each corner of the top of the biocontainer Ensure each clip fastens to the corresponding hole so that the crossbar is holding the four connection points Figure 22 Figure 22 Four hoist clips connected to biocontainer holes 4 4 Filling the Allegro biocontainer system Once the bioc...

Страница 12: ...ons 7 As the filling is in progress the operator MUST regularly raise the hoist to avoid folds developing Warning Failure to raise the hoist during the filling process may result in a fold in the biocontainer that can potentially cause uneven filling Warning Do not open the doors during filling operation Note Allegro 1000 L 3D biocontainers can be filled from either the top or bottom ports The 200...

Страница 13: ... towards you 5 Remove the Allegro biocontainer system 5 Allegro Biocontainer Replacement Allegro 3D biocontainers systems are designed for single use and should be replaced in line with the cGMP requirements of the process Discard the Allegro 3D biocontainer system in accordance with local Health and Safety and Environmental procedures 6 Troubleshooting Guide Problem Allegro biocontainer is not fi...

Страница 14: ...1 516 484 5400 phone biopharm pall com e mail European Headquarters Fribourg Switzerland 41 0 26 350 53 00 phone LifeSciences EU pall com e mail Asia Pacific Headquarters Singapore 65 6389 6500 phone sgcustomerservice pall com e mail International Offices Pall Corporation has offices and plants throughout the world in locations such as Argentina Australia Austria Belgium Brazil Canada China France...