INSTALLATION
6.9
COUNTER-HOOD AND INSPECTION PANEL
For the realization of the counter-hood, we recommend
¢
work with and because it will keep from overloading with
boards and beams the structure of the monobloc, the
marble architrave and the wood beam which must NOT
act as load-bearing structures
The VDF inspection panel is to be positioned on the front
of the canopy.
A removable panel must be installed on one side of the
canopy, for inspection and maintenance of the heating
circuit components, measuring 45 x 80 h cm (Fig. 6.13).
> During realization of the hood it is indispensable to
protect the door sliding frame with nylon covering secured
with adhesive tape (Fig. 6.14). This will keep dust, mortar
or foreign objects from getting stuck between the outlets
and the runners, thus keeping the door itself from sliding.
Remove the protection when work is complete through
the inspection grille.
>¢ ¢
idea to make a smoke test, which means operating the
both with the door open and with the door
closed.
6.9.1
Inspection panel installation and VDF
adjustment
The panel must be installed on the counter-hood using
the counter-frame provided. The panel is required for
any inspections which may be necessary inside the
counter-hood.
For installation follow these instructions:
A) On the plasterboard counter-hood, make a hole of
about 37 x 13.8 cm centred on the axes of the smoke
valve pin. Then insert the conter-frame and secure
it with the two brackets (vertically or horizontally)
by tightening the Philips-head screws as shown in
5.15. For masonry counter-hoods, cement
{`
the VDF valve pin.
B) Place the panel so that it adheres to the counter-
frame, then press until it is completely inserted on
the counter-frame.
C) Also place the heat recovery grille, dimensions 31x8
(provided) in the upper part of the counter-hood
(Fig 6.15).