background image

20

OM90A

HYDRAULIC SCHEMATIC - LOW PRESSURE SYSTEM

HYDRAULIC

RESERVOIR

SWITCH

MAIN

PUMP

CT4

CT1

CT2

CT3

+V

RET

EXT

R

E

COUPLER

CYLINDER

SOLENOID 

VALVE

SYSTEM SHOWN IN “LOCKED” POSITION

SOLENOID IS NOT ACTIVEATED.

The schematic shown is in the 

LOCKED 

position (no electrical power to solenoid).  System pressure is 

applied to the valve by the main hydraulic pump of the prime mover, the bucket circuit is also pressurized 

through the main control valve. System pressure is transferred through valve port “P” to sequence valve 

CT1. CT1 remains closed until the bucket cylinder pressure reaches 4000 PSI or over. At 4000 PSI CT1 

opens and allows a maximum of 3250 PSI to be transferred through sequence valve CT2, valve CT3 

and charges the head end of the coupler cylinder. The system maintains a positive force on the locking 

plate at all times while the bucket cylinder is pressurized.

With the switch in the 

UNLOCK

 position (electrical power applied CT3). Pressure is transferred through 

CT1, CT2, CT3 and energizes the rod-end of the coupler cylinder to retract the coupler locking plate. 

Hydraulic fluid from the head end of the coupler cylinder moves through the “EXT” port back through 

CT3 and drains into the hydraulic reservoir.

Note: The JRB Excavator Coupler is designed to be locked when there is no electrical power. In 

other words, the coupler is locked by default. Electrical power is required to unlock the coupler.  

  OPERATION

Содержание JRB SMART-LOC

Страница 1: ...R ___________________ MODEL NUMBER ___________________ FOR EXCAVATORS OPERATOR S MANUAL 800 428 2538 I www paladinattachments com 820 Glaser Parkway Akron OH 44306 United States of America Copyright M...

Страница 2: ......

Страница 3: ...USE 16 LOCKING SYSTEM OPERATION 17 COUPLER CONTROL BOX 18 HYDRAULIC SCHEMATIC HIGH PRESSURE SYSTEM 19 HYDRAULIC SCHEMATIC LOW PRESSURE SYSTEM 20 LOCKING ATTACHMENT 21 UNLOCKING ATTACHMENT 22 STORAGE 2...

Страница 4: ...4 OM90A THIS PAGE IS INTENTIONALLY BLANK...

Страница 5: ...the operator Make sure the equipment is operated only by trained individuals that have read and understand this manual If there is any portion of this manual or function you do not understand contact...

Страница 6: ...ing Visually inspect your equipment before you start and never operate equipment that is not in proper working order with all safety devices intact Check all hardware to ensure it is tight Make certai...

Страница 7: ...FLUID PRESSURE Hydraulic fluid under pressure can penetrate the skin and cause serious injury or death Hydraulic leaks under pressure may not be visible Before connecting or dis connecting hydraulic...

Страница 8: ...Wear the protective equipment specified by the tool manufacturer SAFELY OPERATE EQUIPMENT Do not operate equipment until you are completely trained by a qualified operator in how to use the controls...

Страница 9: ...At the completion of the useful life of the unit drain all fluids and dismantle by sepa rating the different materials rubber steel plastic etc Follow all federal state and local regulations for recyc...

Страница 10: ...m of the coupler WILL NOT work prop erly if the bucket is in the reverse orientation MODIFICATIONSTOMACHINESTICKCOULDINTERFERWITH COUPLER OPERATION Check for modifications to the underside of the mach...

Страница 11: ...cause an incomplete locking of the coupler to the attachment or damage to the coupler and or the attachment WARNING The JRB Coupler has been extensively studied and tested for both efficiency and saf...

Страница 12: ...ent unless you are authorized and qualified to do so Always read the operator service manuals before any repair is made After completing maintenance or repair check for correct functioning of the atta...

Страница 13: ...nt The decals are identified by their part numbers with reductions of the actual decals shown on the following pages Use this information to order replacements for lost or damaged decals Be sure to re...

Страница 14: ...made to various components The purpose of this section is to help you become familiar with the names of these components This knowledge will be helpful when reading through this manual Lock Arm Lock...

Страница 15: ...Remove attachment from machine and set aside the OEM pins and pin locking hardware The OEM pins will be used to install the coupler to the machine The pins and pin locking hardware provided with the c...

Страница 16: ...ing OPERATION INTENDED USE The JRB Smart Loc Coupler is designed as a tool to provide an efficient way for the operator to attach detach and interchange between different attachments with ease It can...

Страница 17: ...wear keeping a tight connection on the attachment pin Furthermore a secondary lock which consists of a mechanical lock arm that prevents the lock wedge from accidentally being retracted or retracting...

Страница 18: ...ible alarm will sound and signal lights will either flash or remain on To determine the cause of the error perform the fol lowing steps 1 Check the control box for damage If any part of the control bo...

Страница 19: ...nd charges the head end of the coupler cylinder The system maintains a positive force on the locking plate at all times while the bucket cylinder is pressurized With the switch in the UNLOCK position...

Страница 20: ...SI CT1 opens and allows a maximum of 3250 PSI to be transferred through sequence valve CT2 valve CT3 and charges the head end of the coupler cylinder The system maintains a positive force on the locki...

Страница 21: ...pler cylinder and lock wedge have fully retracted Retract the bucket cylinder and position coupler to pick up attachment STEP 3 LOCKING ATTACHMENT Rotate coupler and attachment to full curl position a...

Страница 22: ...ith operation If the coupler is not properly engaged place the attachment on the ground and repeat steps 2 7 NOTE A coupler not locking properly could be caused by attachment pin centers that are outs...

Страница 23: ...ent on the ground Lift coupler clear of attachment Continue to uncurl the coupler from the attachment Slowly lift machine stick at the same time STEP 4 STEP 3 Always make sure attachment is released b...

Страница 24: ...ogether to a central lifting point Lift gradually maintaining the equilibrium of the unit WARNING Use lifting accessories chains slings ropes shackles and etc that are capable of supporting the size a...

Страница 25: ...ture or welds the coupler must be removed from the ma chine and JRB contacted immedi ately Replace broken or missing parts if required Lubricate coupler grease points See below for coupler grease poin...

Страница 26: ...e greased on a daily basis Grease points on the coupler are as shown If any grease fittings are damaged replace and grease Note Cylinders and Pin Kits that are supplied without grease zerks DO NOT nee...

Страница 27: ...he hydraulic system Disconnect hoses from coupler cylinder and remove the coupler from the machine Plug or cap hoses and cylinder ports to prevent contaminates from entering hydraulic system CYLINDER...

Страница 28: ...e to cylinder or valve Hoses or valve are plugged by dirt Incorrect pressure Loss of electrical current to solenoid valve Low or not enough voltage to coils Locking mechanism is binding Secondary Lock...

Страница 29: ...1870 2236 2535 2686 3026 3642 4103 METRIC BOLT TORQUE SPECIFICATIONS NOTE The following torque values are for use with metric hardware that is unplated and either dry or lubricated with engine oil Re...

Страница 30: ...30 OM90A THIS PAGE IS INTENTIONALLY BLANK...

Страница 31: ...hat you receive the correct parts for your specific attachment The product control number model and serial number for your attachment should be recorded in the space provided on the cover of this manu...

Отзывы: