Machine Maintenance Procedures
3-31
Mainboard Removal
0
Prerequisite:
Upper Cover/Keyboard Removal
1.
Disconnect Bluetooth cable from mainboard connector (A).
2.
Disconnect speaker cable from mainboard connector (B).
3.
Disconnect USB FFC cable (C) from mainboard connector. Refer to
USB Module
Removal
4.
Disconnect LAN from mainboard connector (D).
5.
Disconnect microphone cable from mainboard connector (E).
6.
Disconnect LVDS cable from mainboard connector (F).
7.
Disconnect DC-IN cable from mainboard connector (H).
8.
Remove screw (G) from mainboard.
Figure 3-27.
Mainboard Connectors
9.
Lift mainboard at slight angle.
F
B
D
E
H
G
C
A
Содержание EasyNote LS11HR
Страница 1: ...Packard Bell EasyNote LS11HR LS13HR SERVICEGUIDE ...
Страница 10: ...x ...
Страница 11: ...CHAPTER 1 Hardware Specification ...
Страница 14: ...1 4 ...
Страница 31: ...Hardware Specifications and Configurations 1 21 System Block Diagram Figure 1 9 System Block Diagram ...
Страница 55: ...CHAPTER 2 System Utilities ...
Страница 77: ...CHAPTER 3 Machine Maintenance ...
Страница 80: ...3 4 ...
Страница 123: ...CHAPTER 4 Troubleshooting ...
Страница 149: ...CHAPTER 5 Jumper and Connector Locations ...
Страница 156: ...5 8 Jumper and Connector Locations ...
Страница 157: ...CHAPTER 6 FRU List ...
Страница 158: ...6 2 Exploded Diagrams 6 4 FRU List 6 6 Screw List 6 20 ...
Страница 177: ...CHAPTER 7 Model Definition and Configuration ...
Страница 178: ...7 2 Packard Bell EasyNote LS11HR LS13HR 7 3 ...
Страница 202: ...7 26 Model Definition and Configuration ...
Страница 203: ...CHAPTER 8 Test Compatible Components ...
Страница 204: ...8 2 Microsoft Windows 7 Environment Test 8 4 ...
Страница 214: ...8 12 Test Compatible Components ...
Страница 215: ...CHAPTER 9 Online Support Information ...
Страница 216: ...9 2 Introduction 9 3 ...
Страница 218: ...9 4 Online Support Information ...