Repair Procedures
Instruction and Service Manual
54
Pacific Scientific REDI-LINE Generators
Re-assembly of Small Frame Units
NOTE: Steps 1 through 4 must be done in the order presented.
1.
Assemble front end bell (31) and armature (39). Install bearing (35) on
armature and retain with C ring (40) before joining end bell to armature.
2.
Insert tie rods (36) through end bell (31). Route the white lead wire over the
upper tie rod after it is inserted through the end bell.
3.
Carefully Install armature (39) and end bell (31) assembly into shell assembly
(43).
CAUTION: The magnets will attract the armature as it is inserted. Do not let the
armature commutator or bearing to strike a magnet.
4. Install rear end bell (30). Retain with nuts (37). See the paragraph below titled
Brush Replacement for end bell assembly instructions.
NOTE: Steps 5 through 8 can be done independently of one another. Steps 1
through 4 must be complete beforehand.
5.
Install the electrical components inside solenoid cover (3). Make sure wire
routing and electrical connections are properly made.
6.
Install solenoid cover (3) on shell assembly (43) and secure with nuts (29).
7.
Install fan (12), if necessary and fan cover (10).
8. Install AC brush assembly (1). Prepare the brush assembly for installation by
feeding a small solid copper over the face of the brush and out the small hole in
assembly cover. This retains the brush in the holder during installation. Remove
the retaining wire after the assembly is secured.