32
5055.45-A 021115-40
TRNT.BODYA
Installer information
Servicing of the gas stove can be performed from the rear of the unit by removing the
access panel from the unit.
Caution:
The gas line should be installed by a qualified service person in accordance
with all building codes. This section is intended as a guide for qualified
technicians installing this gas stove. Consult local and/or national building
codes before proceeding.
•
Gas supply line connection is located on the rear of the gas stove. Gas
connection accepts a
⅜” 45° flare fitting. Correct gas line diameter must be
used to assure proper operation and pressure.
•
The gas stove input rating is shown in the chart below.
•
A drip leg must be installed in the gas supply line going to the gas control valve
to minimize the possibility of any loose scale or dirt within the gas supply line
from entering the control valve.
•
It is essential that a union or flanged connection (not provided) be installed just
upstream of the valve to allow for repair or replacement of the gas valve.
Check local codes for additional requirements.
Turn on the gas supply and check that all connections are tight and leak free.
Gas pressure requirements
Input Pressure
Natural Gas Propane
Minimum 5.0” WC
12.5” WC
Maximum
13.9” WC
13.9” WC
Manifold Pressure
High
3.8” WC
11” WC
Low
1.1” WC
2.9” WC
Trenton
Gas Orifice Output
AFUE
NG
2.26 mm 24,000 btu/hr 73.0%
LP
1.40 mm 24,000 btu/hr 73.0%
Gas Supply
Gas Pressure Check