background image

230514-20 

SUPER-SD1 9

Chimney and Connector

WARNING: INSTALL CHIMNEY AND ALL COMPONENTS OF CHIMNEY SYSTEM 
ACCORDING TO CHIMNEY MANUFACTURER’S INSTRUCTIONS.

Connect to a listed chimney complying with the requirements of AS/NZS2918/2001 and a 
chimney suitable for use with solid fuel that is lined and in good condition and meets local 
building codes. The chimney fl ue size should be the same as the stove outlet for optimal 
performance. Reducing or increasing the fl ue size may adversely affect stove performance. 
Chimney fl ue exit is to be minimum 1000mm above roof and 600mm above highest projec-
tion within 3000mm. The installation must meet all local codes. Do not connect this unit to 
a chimney fl ue serving another appliance. Minimum system height is 4600mm (measured 
from base of appliance).

Installation Procedure

1. 

Install all components to the chimney manufacturer's installation requirements.  (Outside 
combustion air may  be required, consult local building codes.  See Combustion Air 
section on page 11.)

2.  Installed with the crimped or male ends pointing down.  This will carry any liquid creosote 

or condensation back into the stove.

3.  If a roof or ceiling support is used in the installation, you will fi nd the chimney manufacturer's 

complete instructions packed with the roof support.

4.  To start installing smoke pipe (chimney connector), slip crimped edge of the pipe inside 

the stove collar.  Use holes provided in collar to secure pipe with three screws.

5.  Install the remaining lengths of pipe, one on top of the other, to the fi nished height of 

the chimney connector and secure to each other.

Содержание SUPER 27 SPECTRUM

Страница 1: ...nstalled a house fire may result For your safety followtheinstallationinstructions Contact local building or fire officials about restrictions and installation inspection requirements in your area IMP...

Страница 2: ...nual before you install and use your new room heater Failure to follow instructions may result in property damage bodily injury or even death Contents Safety and Maintenance 3 Maintenance Checks 4 Cre...

Страница 3: ...es only light pressure to seal This will prolong seal life It is important that the door seal be maintained in good condition Periodically inspect seals and replace if necessary Follow instructions in...

Страница 4: ...ng the Chimney System Top baffle board blanket Baffle Top heat shield and mounting bolt Baffle Gasket Brick Rails Manifold Blower The blower should be cleaned out a minimum every six months by using a...

Страница 5: ...ary a certain amount of creosote is inevitable and must be lived with Regular inspection and clean ing is the solution The use of dry seasoned wood and ample combustion air will help to minimize the b...

Страница 6: ...refully on its back 5 Using two 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Optional Ash Cleanout System Install first 1 With stove body...

Страница 7: ...G TESTED TO AS NZS 4013 ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE TESTING AUTHOR ITY IS CONSIDEREDTO BE IN BREACH OFTHEAPPROVAL GRANTED FOR COMPLIANCE WITH AS NZS...

Страница 8: ...combustiblefloorprovidedember protectionmadefroma6mmthicknon combustiblematerialwith a thermal conductivity value of 4w m degree K This protection must extend as follows 300 mm on the firing side and...

Страница 9: ...a chimney flue serving another appliance Minimum system height is 4600mm measured from base of appliance Installation Procedure 1 Install all components to the chimney manufacturer s installation requ...

Страница 10: ...as 3 various cut size bricks If your heater came with an ash cleanout system or an optional one is being installed discard the extra full brick With the heater in the upright position install firebric...

Страница 11: ...stallation requires the unit to be secured to the structure to prevent dislodging of the air duct To draw outside air from behind the stove cut or drill a 100mm hole through a wall behind the unit Use...

Страница 12: ...on monoxide a taste less odourless gas that can kill Under no circumstances should you attempt to barbecue in this heater How to Test Your Wood Add a large piece of wood to the stove when it has a goo...

Страница 13: ...approximately 25mm deep on the firebox bottom to help maintain a hot charcoal bed Optional ash cleanout system The ash dump han dle is located under the ash lip on the left hand side To operate ash d...

Страница 14: ...latch Excessive Creosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t B...

Страница 15: ...ant Nickel CAST 31RSNI 10 Door Handle Assembly WODC 4147C 11 Boost Manifold 4105 12 Firebrick Set BRIC SSERA 13a Brick Rail Left Right SSER RAILSET 14 Replacement Baffle Kit SSER DBAKIT 15 Baffle Pin...

Страница 16: ...kel CAST 31NI Door Casting Radiant Nickel CAST 31RSNI 12 Door Handle Assembly WODC 4147C 13 Boost Manifold 4105 14 Firebrick Set BRIC SSERA 15a Brick Rail Left Right SSER RAILSET 16 Replacement Baffle...

Страница 17: ...rstanding the basic functions of this design Traditionalwoodstoveshadabasiccombustion systemwhichallowedaconsiderableamountof heat energy to escape up the chimney as un burned gases and particulates s...

Страница 18: ...18 SUPER SD1 230514 20...

Страница 19: ...ARDWOOD 10 0 kW OVERALL AVERAGE EFFICIENCY BURNING HARDWOOD 67 WHEN TESTED IN ACCORDANCE WITH AS NZS 4012 PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 ALLENBY RD DUNCAN BC V9L 6V8 Tested by HRL TECHNOLO...

Страница 20: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: