
SUMINSERTA 160309-20
15
ITEM
SIZE
PART NUMBER
A
1 1/2” X 4 1/2” X 1 1/4”
(39 mm x 115 mm x 32 mm)
248.0
B
4” X 4 1/2” X 1 1/4”
(102 mm x 115 mm x 32 mm)
246.0
C
7 1/4” X 4 1/2” X 1 1/4”
(184 mm x 115 mm x 32 mm)
245.0
D
9” X 4 1/2” X 1 1/4”
(230 mm x 115 mm x 32 mm)
5096.99
E
9” X 3 1/2” X 1 1/4”
(102 mm x 115 mm x 32 mm)
3245.5
Pacific
Summit Wood Stoves
Firebrick Installation Instructions
This package contains 19 full-size firebricks, as well as 5 various cut bricks.
If your heater came with an ash cleanout system, or an optional one is being in
-
stalled, one full-size brick (D) will not be needed for your installation.
With the woodstove in the upright position, install firebricks as follows:
1) Place the firebricks on the bottom of the unit first. If stove is equipped with an
ash cleanout system use a total of 8 full-size (D) and 3 cut bricks (A, B, C). If no
ash cleanout system is installed use 9 full-size (D) and 1 cut bricks (C).
2) Next install 4 full-size firebricks against the rear wall as shown.
3) Finally install the side firebricks, 3 full-size bricks and one cut brick (E) on each
side of the firebox as shown.
Without Ash Cleanout System Installed (And Insert)
B
F
E
C
A
D
F
C
E
D
D
With Ash Cleanout System Installed
(Free-standing and insert models)
Содержание SUMMIT WOOD INSERT DESIGN-A
Страница 17: ...SUMINSERTA 160309 20 17 6 6 6 Fig 18 ...