background image

6 SUPER-SD1 

280514-24

24”

610mm

24”

610mm

28”

711mm

28”

711mm

29 1/8”

740mm

29 1/8”

740mm

27 5/8”

702mm

23 5/8”

600mm

23 5/8”

600mm

23 5/8”

600mm

23 5/8”

600mm

10”

254mm

10”

254mm

10”

254mm

10”

254mm

23 7/8

606mm

23 7/8

606mm

28 3/8

721mm

27 1/2

699mm

27 1/2

699mm

29

737mm

29

737mm

27 1/2

699mm

28 1/4

718mm

Super 27 - Pedestal Model

Spectrum

Super 27 - Leg Model

Spectrum Classic

Leg Kit

1)  With the unit on its back, align the ash drawer enclosure 

mounting holes (removable cover facing up) with the holes 
on the stove.

2)  Position the legs over top of the same holes on the stove.
2)  Secure in place with 1" x 1/2" bolts previously removed.
3)  Carefully place the unit in the upright position.

- Super 27 only -

Assembly

Crate Removal

1)  Carefully remove wood top and supports.
2)   Remove plastic cover.
3)  Using a 7/16" wrench, remove lag bolts that secure stove 

body to bottom pallet.

4)  Place stove body carefully on its back.
5)  Using two 3/4" wrench, remove 1" x 1/2" bolts and save 

for later use.

6)  Remove pallet retaining brackets from stove bottom.

Optional Ash Cleanout System 

-(Install 

fi rst)

1)    With stove body laying on its back, remove the ash system 

hole cover and gasket located under the stove.  Discard 
cover plate and gasket.

2)  Inside the stove, remove the two bolts for the ash dump 

from the fi rebox bottom and insert into the brick retainer 
with the fl anges on the the brick retainer pointed away 
from the threads on the bolts.

3)   Replace bolts with brick retainer in the fi rebox  bottom.
4)  Place new gasket provided over existing bolts.
5)  Install ash dump system over gasket and secure with two 

nuts previously removed.

Pedestal Kit

1)  With the unit on its back and the removable cover facing 

up, align the pedestal mounting holes with the holes on 
the stove.\

2)  Secure in place with 1" x 1/2" bolts previously removed.
3)  Carefully place the unit in the upright position.

Содержание SPECTRUM

Страница 1: ...tioninstructions Contact local building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmental...

Страница 2: ...ce 3 Maintenance Checks 4 Creosote 5 Formation and Need for Removal 5 Chimney Fires 5 In Case of a Chimney Fire 5 Avoiding a Chimney Fire 5 Assembly 6 Crate Removal 6 Optional Ash Cleanout System Inst...

Страница 3: ...tained in good condition Periodically inspect seals and replace if neces sary Follow instructions included in the DR31 WDGKIT kit obtainable from your nearest Pacific Energy dealer 5 DOOR GLASS Do not...

Страница 4: ...himney System Top baffle board blanket Baffle Top heat shield and mounting bolt Baffle Gasket Brick Rails Manifold Blower The blower should be cleaned out a minimum every six months by using a vacumn...

Страница 5: ...nd must be lived with Regular inspection and cleaning is the solution The use of dry seasoned wood and ample combustion air will help to minimize the buildup Chimney Fires The result of excessive creo...

Страница 6: ...at secure stove body to bottom pallet 4 Place stove body carefully on its back 5 Using two 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom O...

Страница 7: ...leaks 6 Install connector as per manufacturer s instructions 7 Attach stove to flooring using two 1 4 x 2 or longer lag screws Mobile Home Installation Warning Undernocircumstancesisthisheatertobeins...

Страница 8: ...ney Support 56 1422 mm Minimum Minimum 7 2 1m Ceiling Height Attachment to floor for mobile homes Non combustible floor protector 48 1219 mm 3 914 mm Minimum Hooded vent or 90 elbow turned down The ch...

Страница 9: ...ffect stove performance Chimney flue exit is to be 3 feet 1 m above roof and two feet 0 6 m above highest projection within 10 feet 3 m The installation must meet all local codes Do not connect this u...

Страница 10: ...equires the unit to be secured to the structure to prevent dislodging of the air duct To draw outside air from behind the stove an outside air adaptor may be required see Optional Blower section Cut o...

Страница 11: ...for the first 2 3 times it is very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting...

Страница 12: ...Overnight Burns 1 Open door and rake hot embers towards the front of the heater Add a couple of dry split logs on top of embers close door 2 Adjust air control to high and in just a few minutes logs...

Страница 13: ...perate as follows Air control set to L low operate blower speed control on Low Air control set between L and H low and high oper ate blower speed control at desired setting Automatic To operate the bl...

Страница 14: ...latch Excessive Creosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t B...

Страница 15: ...Door Handle Assembly WODC 4147C 11 Boost Manifold 4105 12 Firebrick Set BRIC SSERA 13a Brick Rail Left Right SSER RAILSET 14 Replacement Baffle Kit SSER DBAKIT 15 Baffle Pin SSER 125001 16 Baffle Gas...

Страница 16: ...kel CAST 31NI Door Casting Radiant Nickel CAST 31RSNI 12 Door Handle Assembly WODC 4147C 13 Boost Manifold 4105 14 Firebrick Set BRIC SSERA 15a Brick Rail Left Right SSER RAILSET 16 Replacement Baffle...

Страница 17: ...ng the basic functions of this design Traditional wood stoves had a basic combustion system which allowed a considerable amount of heat energy to escape up the chimney as unburned gases and particulat...

Страница 18: ...ts back 5 Using a 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facing up...

Страница 19: ...either A B C as shown below if you are installing the optional ash cleanout system or 1 full brick in place of A B if you are not installing the ash cleanout system Next install the side firebricks 4...

Страница 20: ...20 SUPER SD1 280514 24...

Страница 21: ...280514 24 SUPER SD1 21...

Страница 22: ...22 SUPER SD1 280514 24...

Страница 23: ...07 INSTALLEZ ET UTILISEZ SELON LES INSTRUCTIONS D INSTALLATION ET D OP RATION FOURNI AVEC L APPAREIL CONTACTEZ LES OFFICIELS DE LA CONSTRUCTION OU DE SERVICE D INCENDIE POUR DES INFORMATIONS QUANT AUX...

Страница 24: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: