background image

280514-24 

SUPER-SD1 15

Replacement Parts - Super 27

(WHEN ORDERING, INCLUDE PART NUMBER WITH DESCRIPTION)

ITEM 

DESCRIPTION 

PART NO. 

ITEM  DESCRIPTION 

PART NO.

1............ Side Shield, Left or Right.................... SUPD.4302
2............ Rear Defl ector ...................................... SSER.229
3............ Door Catch ........................................ WODC.1461
4............ Ash Lip  (c/w Trim & Hardware) .. ALIP.5037473MB
5............ Glass Clamps  (4 pc.) ......................... SSER.1425
6............ Glass Bar Set  (2 pc.) ...................... WODC.41405
7............ Replacement Glass  (c/w Tape) .....DR31.WGLKIT
8............ Door Gasket Kit ............................. DR31.WDGKIT
9............ Door Casting, Arched Black ................CAST.31ST
.............. Door Casting, Radiant Black ..........CAST.31RSST
.............. Door Casting, Arched Gold .................CAST.31GD
.............. Door Casting, Radiant Gold ..........CAST.31RSGD
.............. Door Casting, Arched Nickel.................CAST.31NI
.............. Door Casting, Radiant Nickel ..........CAST.31RSNI
10 .......... Door  Handle  Assembly ................... WODC.4147C
11 .......... Boost  Manifold  .............................................. 4105
12 .......... Firebrick  Set  .................................... BRIC.SSERA
13a ........ Brick Rail, Left/Right .................... SSER.RAILSET
14 .......... Replacement Baffle Kit .................. SSER.DBAKIT
15 .......... Baffle  Pin .........................................SSER.125001
16 .......... Baffle  Gasket ...................................... SSER.1395
17 .......... Flame Shield  (c/w Bolt and Nut) .........SSER.4115
18 .......... Pedestal Front Cover .......................... SSER.2075
19 .......... Pedestal  Assembly  .............................. SUPD.PED

All parts may be ordered from your nearest Pacifi c Energy 
dealer.  Contact Pacifi c Energy for the location of the dealer 

20.......... Ash System (Leg Model) .............. SUPD.ASHLEG
21.......... Leg, Black.........................................CAST.LEGST
.............. Leg, Gold Plated............................CAST.LEGGLD
.............. Leg, Nickel Plated ............................ CAST.LEGNI
24.......... Ash Dump Assembly .........................WODC.2261
25.......... Ash Box  (Pedestal Model) ................ WODC.4316
26.......... Air Shutter Assembly .........................WODC.4531
27.......... Baffle Air Control Assembly .................. SSER.214
28.......... Leg Adapter .................................... SUPD.LGADA

24 

25 

11 

28

18 

21 

19 

28 

28 

10 

10 

26 

27 

17 

13a 

13b 

14

14

12

14

15 

16 

20

28

SUPD.LGADA

SUPD.ASHLEG

Содержание SPECTRUM

Страница 1: ...tioninstructions Contact local building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmental...

Страница 2: ...ce 3 Maintenance Checks 4 Creosote 5 Formation and Need for Removal 5 Chimney Fires 5 In Case of a Chimney Fire 5 Avoiding a Chimney Fire 5 Assembly 6 Crate Removal 6 Optional Ash Cleanout System Inst...

Страница 3: ...tained in good condition Periodically inspect seals and replace if neces sary Follow instructions included in the DR31 WDGKIT kit obtainable from your nearest Pacific Energy dealer 5 DOOR GLASS Do not...

Страница 4: ...himney System Top baffle board blanket Baffle Top heat shield and mounting bolt Baffle Gasket Brick Rails Manifold Blower The blower should be cleaned out a minimum every six months by using a vacumn...

Страница 5: ...nd must be lived with Regular inspection and cleaning is the solution The use of dry seasoned wood and ample combustion air will help to minimize the buildup Chimney Fires The result of excessive creo...

Страница 6: ...at secure stove body to bottom pallet 4 Place stove body carefully on its back 5 Using two 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom O...

Страница 7: ...leaks 6 Install connector as per manufacturer s instructions 7 Attach stove to flooring using two 1 4 x 2 or longer lag screws Mobile Home Installation Warning Undernocircumstancesisthisheatertobeins...

Страница 8: ...ney Support 56 1422 mm Minimum Minimum 7 2 1m Ceiling Height Attachment to floor for mobile homes Non combustible floor protector 48 1219 mm 3 914 mm Minimum Hooded vent or 90 elbow turned down The ch...

Страница 9: ...ffect stove performance Chimney flue exit is to be 3 feet 1 m above roof and two feet 0 6 m above highest projection within 10 feet 3 m The installation must meet all local codes Do not connect this u...

Страница 10: ...equires the unit to be secured to the structure to prevent dislodging of the air duct To draw outside air from behind the stove an outside air adaptor may be required see Optional Blower section Cut o...

Страница 11: ...for the first 2 3 times it is very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting...

Страница 12: ...Overnight Burns 1 Open door and rake hot embers towards the front of the heater Add a couple of dry split logs on top of embers close door 2 Adjust air control to high and in just a few minutes logs...

Страница 13: ...perate as follows Air control set to L low operate blower speed control on Low Air control set between L and H low and high oper ate blower speed control at desired setting Automatic To operate the bl...

Страница 14: ...latch Excessive Creosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t B...

Страница 15: ...Door Handle Assembly WODC 4147C 11 Boost Manifold 4105 12 Firebrick Set BRIC SSERA 13a Brick Rail Left Right SSER RAILSET 14 Replacement Baffle Kit SSER DBAKIT 15 Baffle Pin SSER 125001 16 Baffle Gas...

Страница 16: ...kel CAST 31NI Door Casting Radiant Nickel CAST 31RSNI 12 Door Handle Assembly WODC 4147C 13 Boost Manifold 4105 14 Firebrick Set BRIC SSERA 15a Brick Rail Left Right SSER RAILSET 16 Replacement Baffle...

Страница 17: ...ng the basic functions of this design Traditional wood stoves had a basic combustion system which allowed a considerable amount of heat energy to escape up the chimney as unburned gases and particulat...

Страница 18: ...ts back 5 Using a 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facing up...

Страница 19: ...either A B C as shown below if you are installing the optional ash cleanout system or 1 full brick in place of A B if you are not installing the ash cleanout system Next install the side firebricks 4...

Страница 20: ...20 SUPER SD1 280514 24...

Страница 21: ...280514 24 SUPER SD1 21...

Страница 22: ...22 SUPER SD1 280514 24...

Страница 23: ...07 INSTALLEZ ET UTILISEZ SELON LES INSTRUCTIONS D INSTALLATION ET D OP RATION FOURNI AVEC L APPAREIL CONTACTEZ LES OFFICIELS DE LA CONSTRUCTION OU DE SERVICE D INCENDIE POUR DES INFORMATIONS QUANT AUX...

Страница 24: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: