background image

071111-20 

SUPER-SD1 15

27 

20 

29 

13 

11 

12 

24 

24

25 

21 

10 

19 

22 

31 

23 

28 

12 

11 

31 

18 

30 

15b 

15a 

16

17 

16

16

14

Replacement Parts - Spectrum and Spectrum Classic

(WHEN ORDERING, INCLUDE PART NUMBER WITH DESCRIPTION)

ITEM 

DESCRIPTION 

PART NO. 

ITEM  DESCRIPTION 

PART NO.

1............ Side Shield, Left or Right............. SPED.4403_ _B
2............ Rear Defl ector .....................................SPEC.4418
3............ Top Panel  (Porcelain Finish) ......... SPED.401_ _A
4............ Screen Trivet, Classic Gold ............ CLAD.CTGDA
.............. Screen Trivet, Classic Nickel ............ CLAD.CTNIA
.............. Screen Trivet, Black .........................CLAD.CTBKA
5............ Door Catch ........................................ WODC.1461
6............ Ash Lip ........................................ SPED.4401_ _B
7............ Glass Clamps  (4 pc.) ......................... SSER.1425
8............ Glass Bar Set  (2 pc.) ...................... WODC.41405
9............ Replacement Glass  (c/w Tape) .....DR31.WGLKIT
10 .......... Door Gasket Kit ............................. DR31.WDGKIT
11 .......... Door Casting, Arched Black ................CAST.31ST
.............. Door Casting, Radiant Black ..........CAST.31RSST
.............. Door Casting, Arched Gold .................CAST.31GD
.............. Door Casting, Radiant Gold ..........CAST.31RSGD
.............. Door Casting, Arched Nickel.................CAST.31NI
.............. Door Casting, Radiant Nickel ..........CAST.31RSNI
12 .......... Door  Handle  Assembly ................... WODC.4147C
13 .......... Boost  Manifold  .............................................. 4105
14 .......... Firebrick  Set  .................................... BRIC.SSERA
15a ........ Brick Rail, Left/Right .................... SSER.RAILSET
16 .......... Replacement Baffle Kit .................. SSER.DBAKIT
17 .......... Baffle  Pin .........................................SSER.125001
18 .......... Baffle  Gasket ...................................... SSER.1395
19 .......... Flame Shield  (c/w Bolt and Nut) .........SSER.4115

20.......... Ash Box  (Spectrum) ......................... WODC.4316
21.......... Pedestal Assembly .............................. SUPD.PED
22.......... Pedestal Cladding  (Hinge Side) .......... SPEC.402
23.......... Pedestal Cladding  (Latch Side) ........... SPEC.403
24.......... Ash Drawer Enclosure  (Classic) .. SUPD.ASHLEG
25.......... Leg, Gold Plated............................CAST.LEGGLD
.............. Leg, Nickel Plated ............................CAST.LEGST
.............. Leg, Black......................................... CAST.LEGNI
27.......... Ash Dump Assembly .........................WODC.2261
28.......... Ash Box Cladding  (Por. Finish) ......SPED.4406_ _
29.......... Air Shutter Assembly .........................WODC.4531
30.......... Baffle Air Control .................................. SSER.214

LEG KIT FOR SPECTRUM 
CLASSIC ONLY

All parts may be ordered from your nearest Pacifi c Energy 
dealer.  Contact Pacifi c Energy for the location of the dealer 
nearest you.
When ordering porcelain fi nish parts, please specify the 
 appropriate code as follows:
 Black 

......BK  Black 

Pearl.........BP

 Ivory 

.......IY  Coffee 

Brown.....CB

 Blue 

........BE Copper...............CU

 Red 

........RD  Titanium.............GN

 Green 

.....GN

Содержание SPECTRUM CLASSICDESIGN-D

Страница 1: ...llationinstructions Contact local building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmen...

Страница 2: ...eosote 4 Formation and Need for Removal 4 Chimney Fires 4 In Case of a Chimney Fire 4 Avoiding a Chimney Fire 4 Assembly 5 Crate Removal 5 Optional Ash Cleanout System Install first 5 Pedestal Kit 5 L...

Страница 3: ...maintained in good condition Periodically inspect seals and replace if necessary Follow instructions included in the DR31 WDGKIT kit obtainable from your nearest Pacific Energy dealer 5 DOORGLASS Dono...

Страница 4: ...t be lived with Regular inspection and clean ing is the solution The use of dry seasoned wood and ample combustion air will help to minimize the buildup Chimney Fires The result of excessive creosote...

Страница 5: ...to bottom pallet 4 Place stove body carefully on its back 5 Using two 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Optional Ash Cleanout...

Страница 6: ...ooring using two 1 4 x 2 or longer lag screws Mobile Home Installation Warning Under no circumstances is this heater to be installed in a makeshift or temporary manner It may be fired only after the f...

Страница 7: ...Excel Ultra Black 4 Selkirk Metalbestos Model DS 8 Simpson Dura Vent Model DVL B As well as one of the following compatible chimney systems All parts 6 CANADA ONLY Security Pro Jet ICC Selkirk Energy...

Страница 8: ...tallation must meet all local codes Do not connect this unit to a chimney flue serving another appliance Minimum system height is 15 feet 4 6 m measured from base of appliance Double Wall Connector Us...

Страница 9: ...o be secured to the structure to prevent dislodging of the air duct Outside air may also be ducted from outside throughthe4 diameterknockoutholeintherearofthe pedestal or leg kit ash box enclosure If...

Страница 10: ...for the first 2 3 times it is very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting...

Страница 11: ...ry replace with gasket 139 5availablefromyourPacificEnergydealer Re install baffle assembly in reverse order The two side pieces of insulation must be tight against the siderails Restarting After Exte...

Страница 12: ...ill al low the fan to turn on as the stove heats up to operating temperature It will also shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range Manual...

Страница 13: ...latch Excessive Creosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t B...

Страница 14: ...ant Nickel CAST 31RSNI 10 Door Handle Assembly WODC 4147C 11 Boost Manifold 4105 12 Firebrick Set BRIC SSERA 13a Brick Rail Left Right SSER RAILSET 14 Replacement Baffle Kit SSER DBAKIT 15 Baffle Pin...

Страница 15: ...CAST 31NI Door Casting Radiant Nickel CAST 31RSNI 12 Door Handle Assembly WODC 4147C 13 Boost Manifold 4105 14 Firebrick Set BRIC SSERA 15a Brick Rail Left Right SSER RAILSET 16 Replacement Baffle Kit...

Страница 16: ...anding the basic functions of this design Traditionalwoodstoveshadabasiccombustion systemwhichallowedaconsiderableamountof heat energy to escape up the chimney as un burned gases and particulates smok...

Страница 17: ...ack 5 Using a 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facing up ali...

Страница 18: ...18 SUPER SD1 071111 20 NOTES...

Страница 19: ...L EXTENDED TO THE FRONT SIDES AND BACK AS INDICATED MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS COMPONENTS REQUIRED FOR MOBILE HOME AND ALCOVE INSTALLATION OUTSIDE AIR KIT AND ONE OF THE FOLLOWING LIS...

Страница 20: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: