background image

071111-20 

SUPER-SD1 19

Label

CERTIFIED FOR CANADA AND U.S.A.
LISTED ROOM HEATER, SOLID FUEL TYPE.
ALSO FOR USE IN MOBILE HOMES
TESTED TO CAN/ULC S627-M93 AND UL 1482-98     

ALDERLEA T5

MODEL SERIES D:   

 SUPER 27    SPECTRUM    CLASSIC

WN# 16408

250509 5050.75 

SUP1-A2

A. SIDEWALL TO UNIT 

18 in. / 455 mm 

14 in. / 355 mm 

14 in. / 355 mm 

14 in. / 405 mm 

16 in. / 405 mm 

16 in. / 405 mm

B. BACKWALL TO UNIT 

12 in. / 305 mm 

 8 in. / 200 mm 

5 in. / 127 mm 

5 in. / 127 mm 

10 in. / 255 mm 

8 in. / 200 mm

C. CORNER TO UNIT 

11 in. / 280 mm 

11 in. / 280 mm 

4 in. / 102 mm 

4 in. / 102 mm 

N/A 

8 in. / 200 mm

D. SIDEWALL TO CONNECTOR 

27 in. / 685 mm 

23 in. / 585 mm 

22.5 in. / 570 mm  22.5 in. / 570 mm  24.5 in. / 620 mm  24.5 in. / 620 mm

E.  BACKWALL TO CONNECTOR  19 in. / 485 mm 

 15 in. / 380 mm 

11.5 in. / 292 mm   11.5 in. / 292 mm  16.5 in. / 420 mm  14.5 in. / 370 mm

F.  CORNER TO CONNECTOR 

22 in. / 560 mm 

22 in. / 560 mm 

14.5 in. / 370 mm  14.5 in. / 370 mm 

N/A  18.5 in. / 470 mm

DO NOT REMOVE THIS LABEL

•  INSTALL AND USE IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION AND OPERATING INSTRUCTIONS.
•  CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS, INSTALLATION PERMIT AND INSPECTION IN 

YOUR AREA.

•  DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE (USA. ONLY).
•  USE 6 INCH / 150MM DIAMETER MINIMUM 24 MSG BLACK OR LISTED CONNECTOR.
•  CONNECT TO A LINED MASONRY CHIMNEY SUITABLE FOR USE WITH SOLID FUELS.
•  DO NOT OBSTRUCT THE SPACE BENEATH THE HEATER.
•  SEE LOCAL BUILDING CODE AND MANUFACTURER'S INSTRUCTIONS FOR PRECAUTIONS REQUIRED WHEN PASSING 

A CHIMNEY THROUGH A COMBUSTIBLE WALL OR CEILING.

•  DO NOT PASS A CHIMNEY CONNECTOR THROUGH A COMBUSTIBLE WALL OR CEILING.
•  MINIMUM CLEARANCE BETWEEN SINGLE WALL CHIMNEY CONNECTOR AND COMBUSTIBLE MATERIALS-

18INCHES/455MM.  CLEARANCE MAY BE REDUCED BY THE USE OF LISTED PIPE SHIELDS, WALL PROTECTORS OR 
OTHER MEANS APPROVED BY LOCAL BUILDING OR FIRE OFFICIALS.

  HORIZONTAL CONNECTOR NOT PERMITTED IN MOBILE HOMES

 

AS TESTED - PIPE SHIELD MAY BE REQUIRED BY LOCAL AUTHORITIES.

*  COMBUSTIBLE ALCOVE SIZE : DEPTH - 4 FT. / 1.22 M MAXIMUM, HEIGHT 7 1/2 FT. / 2.3 M MINIMUM
  COMBUSTIBLE FLOOR MUST BE PROTECTED BY A CONTINUOUS NON-COMBUSTIBLE MATERIAL EXTENDED TO THE 

FRONT, SIDES AND BACK AS INDICATED.

MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS

•  COMPONENTS REQUIRED FOR MOBILE HOME AND ALCOVE INSTALLATION: OUTSIDE AIR KIT, AND ONE OF THE 

FOLLOWING LISTED CONNECTORS:  SECURITY MODELS DP OR DC,  OLIVER MACLEOD MODEL PV,  ENERGY VENT 
E VENT,  SELKIRK METALBESTOS MODEL DS,  METAL FAB MODEL DW,  AMERI-TEC MODEL DBSP,  INDUSTRIAL 
CHIMNEY MODEL EXCEL ULTRA-BLACK, OR  SIMPSON DURA-VENT MODEL DVL IN COMBINATION WITH ONE OF THE 
FOLLOWING COMPATIBLE CHIMNEY SYSTEMS:   APPLIANCE MUST BE INSTALLED WITH PEDESTAL OR LEG KIT 
 ATTACHED.

IN CANADA -  SECURITY MODEL S2100,  OLIVER MACLEOD PROJET MODEL HT 3000,  SELKIRK SENTINEL MODEL CF,  

INDUSTRIAL CHIMNEY MODEL EXCEL 2100.

IN USA -  SECURITY MODEL ASHT OR S2100,  OLIVER MACLEOD MODEL 3103 OR HT 3000,  SELKIRK METALBESTOS 

MODEL SS II,  METAL FAB MODEL 2100,  AMERI-TEC MODEL HS,  INDUSTRIAL CHIMNEY MODEL EXCEL 103HT,  
 SIMPSON DURA-VENT MODEL DURA/PLUS AND DURA TECH.

 

USE COMPONENTS SPECIFIED IN PACIFIC ENERGY INSTALLATION INSTRUCTIONS.

•  OPTIONAL COMPONENTS - WATER COIL (CANADA ONLY), FAN KIT #SSER.BLOW, FAN ELECTRICAL RATING: 115V, 

60HZ, 80WATTS.  DO NOT ROUTE POWER CORD BENEATH HEATER.

•  CAUTION: RISK OF EXCESSIVE TEMPERATURES - KEEP ASH DUMP CLOSED DURING FIRING OF THE HEATER.
•  OPERATE ONLY WITH FEED DOOR CLOSED.  OPEN TO FEED FIRE ONLY.
•  KEEP FURNISHINGS AND OTHER COMBUSTIBLE MATERIALS WELL AWAY FROM HEATER.
•  REPLACE GLASS ONLY WITH CERAMIC GLASS.

MADE IN CANADA

 

J   F   M   A   M   J   J   A   S   O  N   D

2009 2010 

2011 

2012 2013 

2014

DATE OF MANUFACTURE

MANUFACTURED BY:

PACIFIC ENERGY FIREPLACE PRODUCTS LTD.

2975 ALLENBY RD., DUNCAN, BC  V9L 6V8

HOT WHILE IN OPERATION.  DO NOT TOUCH.  KEEP CHILDREN, 
CLOTHING AND FURNITURE AWAY.  CONTACT MAY CAUSE SKIN 
BURNS.  SEE NAMEPLATE AND INSTRUCTIONS.

U.S. ENVIRONMENTAL PROTECTION AGENCY 
CERTIFIED TO COMPLY WITH
JULY, 1990, PARTICULATE EMISSION 
STANDARDS

WH-

CAUTION

 

 

 

IN CANADA 

G. 

18 INCHES / 455 MM

 

H. 

8 INCHES / 200 MM

 

I. 

8 INCHES / 200 MM

IN U.S.A. 

G. 

16 INCHES / 405 MM

 

H. 

5 INCHES / 127 MM

 

I. 

0 INCHES / 0 MM

* ALCOVE

INSTALLATION

USING

DOUBLE WALL 

CONNECTOR

RESIDENTIAL INSTALLATION 

USING SINGLE WALL CONNECTOR

MOBILE HOME
INSTALLATION

USING

DOUBLE WALL

CONNECTOR

VERTICAL CONNECTOR     HORIZONTAL CONNECTOR   VERTICAL CONNECTOR HORIZONTAL CONNECTOR  

RESIDENTIAL CLOSE CLEARANCE

INSTALLATION

USING DOUBLE WALL CONNECTOR

Содержание SPECTRUM CLASSICDESIGN-D

Страница 1: ...llationinstructions Contact local building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmen...

Страница 2: ...eosote 4 Formation and Need for Removal 4 Chimney Fires 4 In Case of a Chimney Fire 4 Avoiding a Chimney Fire 4 Assembly 5 Crate Removal 5 Optional Ash Cleanout System Install first 5 Pedestal Kit 5 L...

Страница 3: ...maintained in good condition Periodically inspect seals and replace if necessary Follow instructions included in the DR31 WDGKIT kit obtainable from your nearest Pacific Energy dealer 5 DOORGLASS Dono...

Страница 4: ...t be lived with Regular inspection and clean ing is the solution The use of dry seasoned wood and ample combustion air will help to minimize the buildup Chimney Fires The result of excessive creosote...

Страница 5: ...to bottom pallet 4 Place stove body carefully on its back 5 Using two 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Optional Ash Cleanout...

Страница 6: ...ooring using two 1 4 x 2 or longer lag screws Mobile Home Installation Warning Under no circumstances is this heater to be installed in a makeshift or temporary manner It may be fired only after the f...

Страница 7: ...Excel Ultra Black 4 Selkirk Metalbestos Model DS 8 Simpson Dura Vent Model DVL B As well as one of the following compatible chimney systems All parts 6 CANADA ONLY Security Pro Jet ICC Selkirk Energy...

Страница 8: ...tallation must meet all local codes Do not connect this unit to a chimney flue serving another appliance Minimum system height is 15 feet 4 6 m measured from base of appliance Double Wall Connector Us...

Страница 9: ...o be secured to the structure to prevent dislodging of the air duct Outside air may also be ducted from outside throughthe4 diameterknockoutholeintherearofthe pedestal or leg kit ash box enclosure If...

Страница 10: ...for the first 2 3 times it is very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting...

Страница 11: ...ry replace with gasket 139 5availablefromyourPacificEnergydealer Re install baffle assembly in reverse order The two side pieces of insulation must be tight against the siderails Restarting After Exte...

Страница 12: ...ill al low the fan to turn on as the stove heats up to operating temperature It will also shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range Manual...

Страница 13: ...latch Excessive Creosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t B...

Страница 14: ...ant Nickel CAST 31RSNI 10 Door Handle Assembly WODC 4147C 11 Boost Manifold 4105 12 Firebrick Set BRIC SSERA 13a Brick Rail Left Right SSER RAILSET 14 Replacement Baffle Kit SSER DBAKIT 15 Baffle Pin...

Страница 15: ...CAST 31NI Door Casting Radiant Nickel CAST 31RSNI 12 Door Handle Assembly WODC 4147C 13 Boost Manifold 4105 14 Firebrick Set BRIC SSERA 15a Brick Rail Left Right SSER RAILSET 16 Replacement Baffle Kit...

Страница 16: ...anding the basic functions of this design Traditionalwoodstoveshadabasiccombustion systemwhichallowedaconsiderableamountof heat energy to escape up the chimney as un burned gases and particulates smok...

Страница 17: ...ack 5 Using a 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facing up ali...

Страница 18: ...18 SUPER SD1 071111 20 NOTES...

Страница 19: ...L EXTENDED TO THE FRONT SIDES AND BACK AS INDICATED MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS COMPONENTS REQUIRED FOR MOBILE HOME AND ALCOVE INSTALLATION OUTSIDE AIR KIT AND ONE OF THE FOLLOWING LIS...

Страница 20: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: