
8
©PACIFIC ENERGY FIREPLACE
PRODUCTS LTD.
40 1/8"
1.02m
41"
1.04m
29"
737mm
24 1/2"
622mm
6 1/8"
156mm
NEO 2.5 Dimensions
Crate Removal
1) Carefully remove wood top and supports.
2) Remove plastic cover.
3) Using a 7/16"(12mm) wrench, remove lag bolts that secure
hold down brackets to bottom pallet.
4) Slide the hold down brackets away from the stove.
Side Panel Removal/Installation
1) To remove the panels, first remove the screws that secure
the panel to the rear shield. Fig. #3
2) Disengage the the tabs in the front of the panel by sliding
the panel forward away from the unit Fig. #2.
2) To install the panels, engage the tabs on the panel front
flange into the slots in the panel mounting bracket. Fig.
#2
3) Attach the panel to the rear shield. Secure with two screws.
Fig. #3
FIG. #2
FIG. #3
SCREWS
Assembly
FIG. #1
310316-24