
7
©PACIFIC ENERGY FIREPLACE
PRODUCTS LTD.
Maintenance Checks
Check the following parts for damage such as cracks, excessive corrosion, burned out sections and excessive warping:
(See website for descriptions and more detail)
Some warping of the baffle is normal(up to 1/4” or 6mm). Replace if the baffle has permanent warping greater than this or
has signs of cracking or breakage.
Weekly:
- Firebrick - for cracking.
- Door Gasket - sagging, placement, damage.
Monthly:
- Brick rail tabs and brick rails.
- Air riser tube in the back of the firebox.
- Back side of airwash chamber - located in the upper front of firebox.
- Baffle locking pin.
- Boost tube cover - located in center of manifold, bottom front of firebox.
When Cleaning the
Chimney System:
- Top baffle board/blanket.
- Baffle.
- Brick Rails.
- Manifold - located in bottom front of firebox.
Blower:
- The blower should be cleaned out a minimum every six months by using a vacumn on the grill openings in the back and
bottom of the blower casing to remove any dust and debris.
- Please contact your dealer if you experience any of the damage listed above. Continuing to operate your stove with
broken parts may accelerate damage to other parts and may void your warranty
310316-24