
22
100000432-50
060718-44
Servicing of the stove can be performed from the rear of the unit by removing the access panel from
the unit.
Caution:
The gas line should be installed by a qualified service person in accordance with all
building codes. This section is intended as a guide for qualified technicians installing this stove.
Consult local and/or national building codes before proceeding.
• Gas supply line connection is located on the rear of the stove. Gas connection accepts a ½” 45°
flare fitting. Correct gas line diameter must be used to assure proper operation and pressure.
• The stove input rating is shown in the chart below.
• A drip leg must be installed in the gas supply line going to the gas control valve to minimize the
possibility of any loose scale or dirt within the gas supply line from entering the control valve.
• It is essential that a union or flanged connection be installed just upstream of the valve to allow
for repair or replacement of the gas valve.
Check local codes for additional requirements.
Turn on the gas supply and check that all connections are tight and leak free.
Gas Supply
WARNING: The gas tray including gasket must be reinstalled after conversion/
installation or servicing has been completed.
Electrical connection
Plug the provided IEC power cord into the receptacle at the rear of the
unit as shown in Figure 20. The battery holder and manual “ON/REMOTE/
OFF” switch are also located here. See details of operation on page 10.