
15
060718-44
100000432-50
Installing the Mirage 18
1. Uncrate the Mirage 18. Examine for shipping damage and that the shipping list is complete.
2. Review the following:
• Mirage 18 dimensions (page 16).
• Locating the Stove (page 17).
• Clearances to combustibles (page 18).
• FlueTerminal Minimum Clearances (page 19).
• Co-axial flueing chart (page 20).
3. Install flueing.
4. Make gas and electrical connections (page 21).
5. Gas pressure check.
6. Gas pressure testing procedure (page 23).
7. Firebox panel set installation .
8. Glass or log set installation (page 26).
9. Door installation (page 28).
10. Install backup batteries and link the hand transmitter to the Mirage 18 (page 29).
11. Adjustments (page 30)
12. Final check.
Before leaving this unit with the customer, the installer must ensure that the appliance is firing
correctly and operation fully explained to the customer.
This includes:
• Adjusting flue damper if flame is too hectic.
• If required, adjusting the primary air to ensure that the flame does not carbon. First allow the unit
to burn for 15 - 20 minutes to stabilize.
Caution: Any alteration to the product that causes sooting or carboning that results in damage is not
the responsibility of the manufacturer.
Installation Checklist