background image

300913-24 

SUPER-SD1 23

Label

 A. 
 18 in. / 455 mm 

14 in. / 356 mm

 B.  
12 in. / 305 mm 

<

 8 in. / 200 mm

 C.  
11

 in. / 280 mm 

11

 in. / 280 mm

 D.  
27 in. / 685 mm 

23 in. / 585 mm

 E.  
19 in. / 485 mm 

<

 15 in. / 380 mm

 F.

  22 in. / 560 mm 

22 in. / 560 mm

 A. 
 14 in. / 356 mm 

14 in. / 356 mm

 B.  
5 in. / 127 mm 

5 in. / 127 mm

 C.  
4 in. / 102 mm 

4 in. / 102 mm

 D.  
22.5 in. / 570 mm 

22.5 in. / 570 mm

 E.  
11

.5 in. / 292 mm 

 1

1.5 in. / 292 mm

 F.

  14.5 in. / 370 mm 

14.5 in. / 370 mm

 A. 
 16 in. / 405 mm 

16 in. / 405 mm

 B.  
10 in. / 255 mm 

8 in. / 200 mm

 C.   

N/A
 

8 in. / 200 mm

 D.  
24.5 in. / 620 mm 

24.5 in. / 620 mm

 E. 
16.5 in. / 420 mm 

14.5 in. / 370 mm

 F

.   

N/A
 

18.5 in. / 470 mm

CERTIFIED FOR CANADA

 AND U.S.A. 

 - SERIES / SÉRIE: 

D

   MODEL

 / MODÈLE: 

SUPER 27 

 SPECTRUM  

 ALDERLEA

 T5   

 CLASSIC   

LISTED ROOM HEA

T

ER, SOLID FUEL

 TYPE.

ALSO FOR USE IN MOBILE HOMES

TESTED T

O/ ÉPROUVÉ SELON: CAN/ULC S627-00 

AND UL

 1482-201

• 
INST

ALL

 AND USE IN 

ACCORDANCE WITH THE MANUF

ACTURER’S INST

ALLA

TION 

AND OPERA

TING 

 INSTRUCTIONS.

• 
CONT

ACT LOCAL

 BUILDING OR FIRE OFFICIALS 

ABOUT RESTRICTIONS, INST

ALLA

TION PERMIT 

AND 

 INSPECTION 

IN 
YOUR 

AREA.

• 
DO NOT CONNECT THIS UNIT T

O

 A

 CHIMNEY

 FLUE SER

VING 

ANOTHER 

APPLIANCE (USA. ONL

Y).

• 
USE 6 INCH / 150MM DIAMETER MINIMUM 24 MSG BLACK OR LISTED CONNECT

OR.

• 
CAN BE CONNECTED T

O

 A

 LINED MASONR

Y

 CHIMNEY

 SUIT

ABLE FOR USE WITH SOLID FUELS.

• 
DO NOT OBSTRUCT THE SP

ACE BENEA

T

H THE HEA

T

ER.

• 
SEE LOCAL

 BUILDING CODE 

AND MANUF

ACTURER'S INSTRUCTIONS FOR PRECAUTIONS REQUIRED 

WHEN P

A

SSING 

A

 CHIMNEY

 THROUGH 

A

 COMBUSTIBLE W

A

LL
 OR CEILING.

• 
DO NOT P

A

SS 
A

 CHIMNEY

 CONNECT

OR THROUGH 

A

 COMBUSTIBLE W

A

LL
 OR CEILING.

• 
MINIMUM CLEARANCE BETWEEN SINGLE W

A

LL
 CHIMNEY

 CONNECT

OR 

AND COMBUSTIBLE MA

TERI-

ALS-18INCHES/455MM.  CLEARANCE MA

Y

 BE REDUCED BY

 THE USE OF LISTED PIPE SHIELDS, W

A

LL
 

PROTECT

ORS OR OTHER MEANS 

APPROVED BY

 LOCAL

 BUILDING OR FIRE OFFICIALS.

• 
COMPONENTS REQUIRED FOR MOBILE HOME 

AND 

ALCOVE INST

ALLA

TION: OUTSIDE 

AIR KIT

.

 
BOTH CHIMNEY

 SYSTEM 

AND CONNECT

OR MUST BE LISTED T

O

:

 
IN CANADA

 -  ULC S-641 LISTED CONNECT

OR 

AND ULC-S-629 LISTED CHIMNEY

 
IN CANADA

 -  ULC S-641 LISTED CONNECT

OR 

AND ULC-S-629 LISTED CHIMNEY

 
IN USA

 -  UL-103 HT LISTED CONNECT

OR 

AND CHIMNEY

 
IN USA

 -  UL-103 HT LISTED CONNECT

OR 

AND CHIMNEY

 

• 
USE COMPONENTS SPECIFIED IN P

ACIFIC ENERGY

 INST

ALLA

TION INSTRUCTIONS.

• 
APPLIANCE MUST BE INST

ALLED WITH PEDEST

AL
 OR LEG KIT 

A

T

TACHED.

• 
OPTIONAL

 COMPONENTS - F

AN KIT

, F

AN ELECTRICAL

 RA
TING: 1

15V

, 60HZ, 1.0 

AMP

.

 
DO NOT ROUTE POWER CORD BENEA

T

H HEA

T

ER.

• 
CAUTION: RISK OF EXCESSIVE TEMPERA

T

URES - KEEP

 ASH DUMP

 CLOSED DURING FIRING OF THE 

HEA

T

ER.

• 
OPERA

T

E ONL

Y

 WITH FEED DOOR CLOSED.  OPEN T

O

 FEED FIRE ONL

Y.

• 
KEEP

 FURNISHINGS 

AND OTHER COMBUSTIBLE MA

TERIALS WELL

 A

W

A

Y

 FROM HEA

T

ER.

• 
REPLACE GLASS ONL

Y

 WITH CERAMIC GLASS.

 
HORIZONT

A

L

 CONNECT

OR NOT PERMITTED IN MOBILE HOMES

 
AS TESTED - PIPE SHIELD MA

Y

 BE REQUIRED BY

 LOCAL

 AUTHORITIES.


COMBUSTIBLE 

ALCOVE SIZE : DEPTH - 3 FT

. / .91 M MAX., HEIGHT 7 FT

. / 2.1 M MIN., WIDTH 4 FT

. / 1.2 M 

MIN.

 
COMBUSTIBLE FLOOR MUST BE PROTECTED BY

 A

 CONTINUOUS NON-COMBUSTIBLE MA

TERIAL

 EX-

TENDED T

O

 THE FRONT

, SIDES 

AND BACK 

AS INDICA

TED.

MINIMUM CLEARANCES T

O

 

COMBUSTIBLE MA

TERIALS/

DÉGAGEMENTS MINIMALES 

AUX 

MA
TÉRIAUX COMBUSTIBLES

DO NOT

 REMOVE 

THIS LABEL

 RACCORD

 VERTICAL

 CONNECT

OR      

RACCORD

 HORIZONT

A

L CONNECT

OR 
 

RESIDENTIAL

 CLOSE CLEARANCE INST

ALLA

TION 

USING DOUBLE W

A

LL

 CONNECT

OR/ 

INST

ALLA

TION 

RÉSIDENTIELLE 

AVEC DÉGAGEMENT MINIMAL, UTILISANT 

UN RACCORD DE MUR DOUBLE

* ALCOVE 

INST

ALLA

TION

USING DOUBLE W

A

LL

 

CONNECT

OR/
* INST

ALLA

TION 

EN 
ALCÔVE UTILISANT UN 

RACCORD DE MUR DOUBLE

WH-

RESIDENTIAL

 INST

ALLA

TION 

USING SINGLE W

A

LL
 CONNECT

OR/

INST

ALLA

TION RÉSIDENTIELLE UTILISANT UN 

RACCORD DE MUR SIMPLE

 IN CANADA

 

G. 

18 INCHES / 455 MM

 AU 
CANADA

 

H. 

8 INCHES / 200 MM

 

I. 

8 INCHES / 200 MM

 IN U.S.A. 

G. 

16 INCHES / 405 MM

 AUX 

ÉT

AT

S-UNIS

 H. 

5 INCHES / 127 MM

 

I. 

0 INCHES / 0 MM

MOBILE 

HOME INST

ALLA

TION

USING DOUBLE W

A

LL

 

CONNECT

O

R/ 
INST
ALLA

TION 

EN MAISON MOBILE UTILISANT 

UN RACCORD DE MUR DOUBLE

 

WN#16408        ETL#4001507

• 

INST

ALLEZ ET UTILISEZ SELON LES INSTRUCTIONS D’INST

ALLA

TION ET D’OPÉRA

TION FOURNI 

AVEC L

’APP
AREIL..

• 

CONT

ACTEZ LES OFFICIELS DE LA

 CONSTRUCTION OU DE SER

VICE D’INCENDIE POUR DES INFORMA

TIONS QUANT 

AUX 

RESTRICTIONS. PERMIS D’INST

ALLA

TION ET INSPECTIONS DANS VOTRE RÉGION.

• 

NE RELIEZ P

A

S CET 

APP
AREIL

 À UN CONDUIT DE CHEMINÉE DESSER

VANT DÉJÀ UN 

AUTRE 

APP
AREIL

 (ÉT
AT

S-UNIS SEULE-

MENT).

• 

UTILISEZ UN RACCORDEMENT NOIR OU CLASSÉ DE 24 MSG ET 

AVEC UN DIAMÈTRE D’AU MOINS 6 POUCES / 150 mm.

• 

PEUT ÊTRE CONNECTÉ À UNE CHEMINÉE DE MAÇONNERIE 

ALIGNÉE PRÊTE À L

’EMPLOI 

AVEC DES COMBUSTIBLES SOLIDES.

• 

DO NOT OBSTRUCT THE SP

ACE BENEA

TH THE HEA

TER / 

• 

CONSUL

TEZ LE CODE LOCAL

 DE CONSTRUCTION ET LES INSTRUCTIONS DU F

ABRICANT QUANT 

AUX PRÉCAUTIONS À 

PRENDRE LORSQUE VOUS F

A

ITES P

A

SSER UNE CHEMINÉE À TRA

VERS D’UN MUR OU D’UN PLAFOND COMPOSÉS DE MA

TÉ-

RIAUX COMBUSTIBLES.

• 

NE F

A

ITES P

A

S P
A

SSER UN RACCORDEMENT DE CHEMINÉE À TRA

VERS D’UN MUR OU D’UN PLAFOND COMPOSÉS DE MA

TÉ-

RIAUX 

• 

DÉGAGEMENT MINIMAL

 ENTRE UN RACCORDEMENT DE CHEMINÉE À UN MUR SIMPLE ET T

O

UT MA

TÉRIEL

 COMBUSTIBLE - 18 

POUCES / 455 mm.  CE DÉGAGEMENT PEUT ÊTRE RÉDUIT EN UTILISANT DES PROTECTEURS DE TUY

AUX CLASSÉS, PROTEC-

TEURS DE MUR OU 

AUTRES MOYENS 

APPROUVÉS P

AR LES OFFICIELS DE LA

 CONSTRUCTION OU DU SER

VICE D’INCENDIE 

DE VOTRE RÉGION.

 
CONNECTEUR HORIZONT

AL
 NON PERMIS DANS MAISONS MOBILES

• 
L’APP
ARIEL

 DOIT COMPORTER UN ENSEMBLE POUR PIEDST

ABLE OU SUR P

A

TTES.

• 
PIÈCES REQUISES POUR INST

ALLA

TION EN MAISON MOBILE OU EN 

ALCÔVE:  NÉCESSAIRE D’APPROVI-

SIONNEMENT D’AIR EXTÉRIEUR ET L

’UN DES RACCORDS SUIV

ANTS:  EN COMBINAISON 

A

VEC L

’UN DES 

SYSTÈMES DE CHEMINÉE COMP

A

T

IBLES SUIV

ANTS: 

 AU CANADA

 - LE ULC S-641 CONNECTEUR ENUMERES ET ULC-S-629 ONT ENUMERE CHEMINEE

• 

 PIÈCES EN OPTION - NÉCESSAIRES DE SOUFFLERIE, INDICES ÉLECTRIQUES DE SOUFFLERIE:  1

15V

, 60HZ, 1.0 

AMP

.  LE FIL

 

ÉLECTRIQUE NE DOIT P

A

S ÊTRE PLACÉ SOUS LE POÈTE.

 

LE FIL

 ÉLECTRIQUE NE DOIT P

A

S ÊTRE PLACÉ SOUS LE POÊLE

• 

AT

TENTION:  RISQUE DE TEMPÉRA

TURES EXCESSIVES - GARDES LE TIROIR DE CENDRES FERMÉ PENDANT L

’ALLUMAGE DU 

POÈTE.

• 

OPÉREZ SEULEMENT LORSQUE LA

 PORTE D’ALIMENT

ATION EST FERMÉE.  

• 

OUVREZ SEULEMENT POUR 

ALIMENTER LE FEU.

• 

GARDEZ LES MEUBLES ET 

AUTRES MA

TÉRIAUX COMBUSTIBLES BIEN ÉLOIGNÉS DU POÊLE.

• 

REMPLACES LA

 VITRE 

AVEC UNIQUEMENT DE LA

 VITRE CÉRAMIQUE.

 CONNECTEUR HORIZONT

A

L

 NON PERMIS DANS MAISONS MOBILES

TEL

 QUO ÉPROUVÉ UN PROTECTEUR DE TUY

AU PEUT ÊTRE REQUIS P

AR LES 

AUT

ORITÉS LOCALES

 * 

DIMENSION D’ALCOVE COMBUSTIBLE:  PROFONDEUR - 3 PIEDS / .91M, HAUTEUR 7 PIEDS/2.1M, LARGEUR 4 PIEDS/1.2M MINI-

MUM.

 

LE PLANCHER COMBUSTIBLE DOIT ÊTRE PROTÉGÉ P

AR UN MA

TÉRIEL

 NON-COMBUSTIBLE T

O

UT D’UNE PIÈCE QUI DOIT 

S’ÉTENDRE DE P

AR LE DEV

ANT
, LES COTÉS ET L

’ARRIÈRE TEL

 QU’INDIQUÉ.

A. 
SIDEW

A

LL

 T

O

 UNIT/

 
MUR DE CÔTE / 

APP
AREIL

B. 
BACKW

ALL

 T

O

 UNIT/

M

UR DE FOND / 

APP
AREIL

C. 
CORNER T

O

 UNIT/

COIN / 

APP
AREIL

D. 
SIDEW

A

LL

 T

O

 CONNECT

OR/

MUR DE CÔTE / RACCORD

E. 
BACKW

ALL

 T

O

 CONNECT

OR/

MUR DE FOND / RACCORD

F. 

CORNER T

O

 CONNECT

OR/

COIN / RACCORD

BACK  I

HEA

T

ER

G

SIDE

H

FRONT

SIDE

H

COTE

COTE

DEV

A

NT

POELE

DOS

 RACCORD

 VERTICAL

 CONNECT

OR      

RACCORD

 HORIZONT

AL
 CONNECT

OR 
 

MADE IN CANADA/ 

FABRIQUÉ AU 

CANADA


 F 
 M 

 A

 

 M 
 J 

 J 

 A

 

 S 

 O 


 D

2012 

2013 2014 2015 

2016 

2017

DA
TE OF MANUF

ACTURE/ 

DA
TE DE MANUF

ACTURE

SUP1-A2

U.S. ENVIRONMENT

A

L

 PROTECTION 

AGENCY

 CERTIFIED T

O

 COMPL

Y

 WITH JUL

Y, 

1990, P

ARTICULA

T

E EMISSION ST

ANDARDS// 

CERTIFIÉ P

AR L

’AGENCE DE PROTECTION DE 

L’ENVIRONNEMENT DES ÉT

AT

S-UNIS (EP

A) EN 

ACCORD 

AVEC LES ST

ANDARDS D’ÉMISSION DE 

PARTICULES DE JUILLET 1990

5050.75

05

111
2

MANUF

ACTURED BY/ 

FABRIQUÉ P

AR:

P

ACIFIC ENERGY

 FIREPLACE PRODUCTS L

T

D.

2975 

ALLENBY

 RD., DUNCAN, BC  V9L

 6V8

HOT WHILE IN OPERA

TION.  DO NOT T

O

UCH.  KEEP

 CHILDREN, CLOTHING 

AND FURNITURE 

A

W

A

Y.  CONT

ACT MA

Y

 CAUSE SKIN BURNS.  SEE NAMEPLA

T

AND INSTRUCTIONS.// 

CHAUD LORSQU’EN OPÉRA

TION.  NE P

A

S T
O

UCHER, TENEZ LES 

ENF
ANTS ET LES VÊTEMENTS BIEN À L

’ÉCART

.  LE CONT

ACT PEUT CAUSER DES BRÛLURES 

À LA

 PEAU.  CONSUL

TEZ LA

 PLAQUE CE CONSTRUCTEUR ET LES INSTRUCTIONS.

CAUTION

ADJACENT

 W
A

LL

BACK W

A

LL

D

A

SIDE WALL

B

E

ADJACENT WALL

F

C

MUR COTE

MUR ARRIERE

MUR ADJACENT

MUR ADJACENT

Содержание DESIGN-D

Страница 1: ...tioninstructions Contact local building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmental...

Страница 2: ...ntenance 3 Maintenance Checks 4 Creosote 5 Formation and Need for Removal 5 Chimney Fires 5 In Case of a Chimney Fire 5 Avoiding a Chimney Fire 5 Assembly 6 Crate Removal 6 Optional Ash Cleanout Syste...

Страница 3: ...maintained in good condition Periodically inspect seals and replace if necessary Follow instructions included in the DR31 WDGKIT kit obtainable from your nearest Pacific Energy dealer 5 DOORGLASS Dono...

Страница 4: ...he Chimney System Top baffle board blanket Baffle Top heat shield and mounting bolt Baffle Gasket Brick Rails Manifold Blower The blower should be cleaned out a minimum every six months by using a vac...

Страница 5: ...t be lived with Regular inspection and clean ing is the solution The use of dry seasoned wood and ample combustion air will help to minimize the buildup Chimney Fires The result of excessive creosote...

Страница 6: ...to bottom pallet 4 Place stove body carefully on its back 5 Using two 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Optional Ash Cleanout...

Страница 7: ...o flooring using two 1 4 x 2 or longer lag screws Mobile Home Installation Warning Under no circumstances is this heater to be installed in a makeshift or temporary manner It may be fired only after t...

Страница 8: ...Minimum 7 2 1m Ceiling Height Attachment to floor for mobile homes Non combustible floor protector 48 1219 mm 3 914 mm Minimum Hooded vent or 90 elbow turned The chimney may incor porate an offset To...

Страница 9: ...ve performance Chimney flue exit is to be 3 feet 1 m above roof and two feet 0 6 m above highest projection within 10 feet 3 m The installation must meet all local codes Do not connect this unit to a...

Страница 10: ...llation requires the unit to be secured to the structure to prevent dislodging of the air duct To draw outside air from behind the stove an outside air adaptor may be required see Optional Blower sect...

Страница 11: ...for the first 2 3 times it is very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting...

Страница 12: ...ry replace with gasket 139 5availablefromyourPacificEnergydealer Re install baffle assembly in reverse order The two side pieces of insulation must be tight against the siderails Restarting After Exte...

Страница 13: ...ill al low the fan to turn on as the stove heats up to operating temperature It will also shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range Manual...

Страница 14: ...latch Excessive Creosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t B...

Страница 15: ...ant Nickel CAST 31RSNI 10 Door Handle Assembly WODC 4147C 11 Boost Manifold 4105 12 Firebrick Set BRIC SSERA 13a Brick Rail Left Right SSER RAILSET 14 Replacement Baffle Kit SSER DBAKIT 15 Baffle Pin...

Страница 16: ...kel CAST 31NI Door Casting Radiant Nickel CAST 31RSNI 12 Door Handle Assembly WODC 4147C 13 Boost Manifold 4105 14 Firebrick Set BRIC SSERA 15a Brick Rail Left Right SSER RAILSET 16 Replacement Baffle...

Страница 17: ...anding the basic functions of this design Traditionalwoodstoveshadabasiccombustion systemwhichallowedaconsiderableamountof heat energy to escape up the chimney as un burned gases and particulates smok...

Страница 18: ...ts back 5 Using a 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facing up...

Страница 19: ...either A B C as shown below if you are installing the optional ash cleanout system or 1 full brick in place of A B if you are not installing the ash cleanout system Next install the side firebricks 4...

Страница 20: ...20 SUPER SD1 300913 24...

Страница 21: ...300913 24 SUPER SD1 21...

Страница 22: ...22 SUPER SD1 300913 24...

Страница 23: ...07 INSTALLEZ ET UTILISEZ SELON LES INSTRUCTIONS D INSTALLATION ET D OP RATION FOURNI AVEC L APPAREIL CONTACTEZ LES OFFICIELS DE LA CONSTRUCTION OU DE SERVICE D INCENDIE POUR DES INFORMATIONS QUANT AUX...

Страница 24: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Отзывы: