System Operations Manual
www.paceworldwide.com
Page 27 of 50
6. Operation
Note: It is recommended that the TF 1700 and TF 2700 be turned on for at least 10
minutes before use to ensure the bottom side heater has reached its set temperature and
stabilized. Once the bottom side heater is at operating temperature it will deliver
consistent heating, ensuring highly repeatable heating from operation to operation.
It is also advisable to conduct a trial operation each day to warm the top heater
and ensure all systems are operating properly. It is important to verify the airflow of the
unit with each profile to be run.
Verify that the devices/parts being soldered to the PCB do not exceed the height
limitations. Exceeding the limitations may interfere with the operation of the machine.
The maximum height of any component or device on the top of the PCB is limited
to 30mm (1.2”).
The maximum height of any component or device on the bottom of the PCB is
limited to 15 mm (0.6”).
a. Production. Component alignment and installation – Note: If at any time you
need to abort the process mouse click on the Red “Home” button.
i.
Mouse click on Production to switch to the production screen. (Figure 6)
ii.
Select a profile.
iii.
Install the proper vacuum pick. (Para. 5d)
iv.
Install the proper nozzle. (Para. 5e)
v.
Place the PCB between the arms on the TF 1700 and tighten the
retention screw. (Figure 16)
Figure 16
vi.
Position the board so the red laser sighting light is roughly in the center
of the placement site. To move the board forward and back simply
move the PCB in the arms. To move the assembly left and right push
the release handle away from you and move the assembly. Pull the
release handle towards you to secure the assembly.
vii.
Mouse click on the green button to extend camera.
Retention Screw
Release Handle