4-8
Section 4
PTO Mounting & Programming
9/18
4-4. PTO MOUNTING CLEARANCE
This application guide indicates if a PTO has sufficient clearance to truck components in various mounting configurations.
A green “ok” indicates that there is sufficient clearance to other truck components. A red “x” indicates that there minimal or
no clearance and the application is not recommended. The truck components investigated in this guide include frame rails,
Set Back Front Axle (SBFA) rear shackle, SBFA Front Air Suspension (FAS) rear shackle, over-bell frame brace, coolant
return manifold, transmission clutch actuator, and exhaust system components.
Usage Notes:
1. This application guide is only applicable to 2.1M trucks.
2. Only the specified PTO configurations have been analyzed.
3. Horizontal crossover exhaust limits access behind PTO’s for shaft drives and other PTO attachments.
4. Eaton FR transmissions require the use of a 30° adapter when installing Chelsea or Muncie transmission
PTO’s in the right hand position.
5. Eaton RT & Ultrashift Plus transmissions require the use of a 49° adapter when installing Chelsea transmis-
sion PTO’s in the right hand position.
6. Eaton RT & Ultrashift Plus transmissions require the use of a 55° adapter when installing Muncie transmission
PTO’s in the right hand position.
7. Eaton transmissions require the use of a 6 to 8 Bolt adapter when installing a 6 bolt PTO in the bottom posi-
tion.
2.1M PTO MOUNTING CLEARANCE CHARTS
TABLE 4-1. 10-Bolt PTO’s for Allison Transmissions
Содержание Kenworth T680 2019
Страница 1: ...Kenworth Heavy Duty Body Builder Manual 2019 ...
Страница 2: ...This page intentionally left blank ...
Страница 3: ...Kenworth Heavy Duty 2 1m Cab Body Builder Manual ...
Страница 12: ...This page intentionally left blank ...
Страница 22: ...This page intentionally left blank ...
Страница 77: ...4 7 Section 4 PTO Mounting Programming 9 18 Allison Transmission ...
Страница 108: ...2 17 5 22 Section 5 Exhaust Aftertreatment This page intentionally left blank ...
Страница 144: ...8 8 2 17 Section 8 Frame Modifications This page intentionally left blank ...
Страница 155: ...10 5 9 18 Section 10 Electrical Chassis Node Figure 10 3 Electrical Harness Overview ...
Страница 162: ...10 12 9 18 Section 10 Electrical FIGURE 10 14 MX 11 and MX 13 Connector Location ...
Страница 164: ...10 14 9 18 Section 10 Electrical FIGURE 10 16 X15 Connection location FIGURE 10 17 ISX12 Connection location ...
Страница 165: ...10 15 9 18 Section 10 Electrical FIGURE 10 18 Power Distribution Center ...
Страница 166: ...10 16 9 18 Section 10 Electrical FIGURE 10 19 Engine Side Fuse Box Full Content Population ...
Страница 167: ...10 17 9 18 Section 10 Electrical FIGURE 10 20 Dash Side Fuse Box Full Content Population ...
Страница 171: ...10 21 9 18 Section 10 Electrical FIGURE 10 24 Overview Layout FIGURE 10 25 ...
Страница 177: ...10 27 9 18 Section 10 Electrical FIGURE 10 36 Spare circuit location on Power Distribution Center Dash Side P001 ...
Страница 178: ...10 28 9 18 Section 10 Electrical FIGURE 10 37 Spare circuit diagram P001 and P096 ...
Страница 182: ...10 32 9 18 Section 10 Electrical FIGURE 10 41 Telltale Installation Diagnostics Service Tool Connection ...
Страница 193: ...A 5 2 17 Appendix A Vehicle Identification This page intentionally left blank ...
Страница 194: ...A 6 2 17 Appendix A Vehicle Identification Kenworth Truck Company P O Box 1000 Kirkland WA 98083 425 828 5000 ...