PowerHalt is a registered trademark of Pacbrake Co.
5
PH3 EL AUTOMATIC ACTUATION
L6319
3
S W I T C H I N S TA L L AT I O N
• Use the layout template provided below (picture 3C) and cut
out and mark drill locations for the switch to ensure accuracy.
Refer to picture 3A for reference for the
switch location.
Caution: Ensure control wiring is moved so it is not damaged
during drilling (see picture 3B)
• Drill a 1
1
⁄
8
" hole for the wire connector and drill two ¼" holes
for fasteners (as per template layout, picture 3C).
• De-burr the holes to ensure that no wires will be damaged
• Install the switch to the panel location with the supplied button
head cap screws, washers, and nuts.
• Torque the nuts on the backside of the panel of both bolts to
15-25 in-lbf (1.7-2.8) N•m.
CAUTION: Do not over-torque nuts.
4
M A G N E T I C P I C K U P I N S TA L L AT I O N
• On your LTW20 / BV - 4LEZ light tower locate the factory
installed magnetic pick connector in your control panel and
disconnect from the panel connection.
5
W I R I N G H A R N E S S
I N S TA L L AT I O N
• Connect the wiring harness to the
PowerGuard controller.
• Run the Power leads to the battery
location and connect.
• Connect the tee-tap harness between
the existing harness and existing
connector, as per option 4 of the wiring
schematic (at the end of this manual)
• Run the Valve wiring and connect to
valve location.
Note: For detailed wiring refer to wiring
schematic provided at back of this
installation manual.
3A
3B
3C
DRILL TEMPLATE
1.7"
2.7"
2.05"
0.9"
1
⁄
4
" Hole
1
⁄
4
" Hole
1
1
⁄
8
" Hole
NOTE: When printing out the drill template for use make sure
your printer is not scaling the image or stretching it. Open your
print dialogue box and select print at 100% scale.