Page 8
General Power
Requirements
Input power and grounding must be available prior to system installa-
tion. Sufficient AC power must be available for all equipment. A sepa-
rate earth safety ground connection is also required for the whole
system.
Please note that an electrical conduit is not an acceptable separate
earth ground path. However, water pipes or other known good earth
ground paths may sometimes be used. Consult your local code and
regulations to determine if water pipes or other earth ground paths are
acceptable forms of grounding.
Locate the fuse or circuit-breaker-protected AC outlets and safety
ground connections as close to the system as possible (in order to
keep cable runs as short as possible).
System Input
Power
Requirements
WARNING! ELECTRICAL HAZARD.
Grounding circuit continuity is
vital for the safe operation of equipment. Never operate equipment
with the grounding conductor disconnected. Wiring must conform to
country and local electrical codes.
DANGER! ELECTRICAL SHOCK HAZARD
. Severe electrical shock
can result from operating the instrument without the instrument panels
in place. Do not remove the instrument panels. High-voltage contacts
are exposed when instrument panels are removed from the instru-
ment.
DANGER! ELECTRICAL HAZARD.
Use properly configured and
approved line cords for the voltage supply in your facility.
DANGER! ELECTRICAL HAZARD.
Plug the system into a properly
grounded receptacle with adequate current capacity.
Overvoltage
Rating
The Sequel System has an installation (overvoltage) category of III
(three)
and is classified as nonportable equipment.
Electrical
Connections
The Sequel System must be plugged into a grounded circuit capable of
delivering at most 30 Amps for a 200-240V power source.
The maximum power consumption is 3000 Watts.
DANGER!
ELECTRICAL SHOCK AND LASER HAZARD Installation, mainte-
nance and repair are only allowed for authorized service personnel. Do
not remove the panels of the Sequel System.
For more information, see the