![P.Lindberg XN10 Скачать руководство пользователя страница 97](http://html1.mh-extra.com/html/p-lindberg/xn10/xn10_manual_3087278097.webp)
14
MAN 9064762 EN V1
P. Lindberg A/S
Sdr. Ringvej 1
www.p-lindberg.dk
Tel.: 70212626
DK-6600 Vejen
e-mail: [email protected]
Pivot bolts between bucket and piston rod
Other
Pivot bolt between boom and arm: Pivot bolt for the arm’s cylinder piston: Pivot bolt
at bottom of bucket’s cylinder
Lubrication of rotary bearing – every 250 hours
1.
Park the machine on a flat surface.
2.
Lower the bucket to the ground.
3.
Allow the engine to operate in idle at low speed for five minutes.
4.
Turn the ignition key to OFF and remove the ignition key.
5.
With the machine’s upper structure at a standstill, lubricate the two lubrication nipples.
6.
Start the engine and raise the bucket free of the surface and then rotate the upper
structure 45
o
(1/8 turn).
7.
Lower the bucket to the ground.